Difference between revisions of "Simulation Meeting September 28 2023 11AM ET"

From Moller Wiki
Jump to: navigation, search
(Agenda)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 
Back to [[Main_Page|Main Page]] >> [[Simulation_Meetings | Simulation Meetings]]  
 
Back to [[Main_Page|Main Page]] >> [[Simulation_Meetings | Simulation Meetings]]  
  
[[Simulation_Meeting_September_21_2023_11AM_ET | previous meeting]] <<  >> [[Simulation_Meeting_October_5_2023_11AM_ET | following meeting]]
+
[[Simulation_Meeting_September_21_2023_11AM_ET | previous meeting]] <<  >> [[Simulation_Meeting_October_12_2023_11AM_ET | following meeting]]
  
 
[[Simulations | Simulation page ]]
 
[[Simulations | Simulation page ]]
Line 13: Line 13:
  
 
=Minutes=
 
=Minutes=
*
+
* Pion Background from Hyperon Production: Initial results show the possibility of higher energy low angle pions reaching main detector
 +
* The generator will soon be properly integrated to remoll code
 +
* Currently beam asymmetries are not included but they will in future

Latest revision as of 14:40, 11 October 2023

Back to Main Page >> Simulation Meetings

previous meeting << >> following meeting

Simulation page


Agenda

  1. Hyperon Production and Pion Background: Andrew Hurley
  2. Drift pipe Endcap geometry update: Prakash

Attendance

Minutes

  • Pion Background from Hyperon Production: Initial results show the possibility of higher energy low angle pions reaching main detector
  • The generator will soon be properly integrated to remoll code
  • Currently beam asymmetries are not included but they will in future