Simulation Meeting September 28 2023 11AM ET
From Moller Wiki
Back to Main Page >> Simulation Meetings
previous meeting << >> following meeting
Agenda
- Hyperon Production and Pion Background: Andrew Hurley
- Drift pipe Endcap geometry update: Prakash
Attendance
Minutes
- Pion Background from Hyperon Production: Initial results show the possibility of higher energy low angle pions reaching main detector
- The generator will soon be properly integrated to remoll code
- Currently beam asymmetries are not included but they will in future