Simulation Meeting September 28 2023 11AM ET

From Moller Wiki
Jump to: navigation, search

Back to Main Page >> Simulation Meetings

previous meeting << >> following meeting

Simulation page


Agenda

  1. Hyperon Production and Pion Background: Andrew Hurley
  2. Drift pipe Endcap geometry update: Prakash

Attendance

Minutes

  • Pion Background from Hyperon Production: Initial results show the possibility of higher energy low angle pions reaching main detector
  • The generator will soon be properly integrated to remoll code
  • Currently beam asymmetries are not included but they will in future