Difference between revisions of "Technical Board Meeting Jan 23, 2024"

From Moller Wiki
Jump to: navigation, search
(Minutes)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
Back to [[Main_Page|Main Page]] >> [[Technical_Board | Technical Board]]
 
Back to [[Main_Page|Main Page]] >> [[Technical_Board | Technical Board]]
  
[[Technical_Board_Meeting_Oct_23,_2023 | Technical Board Meeting October 23, 2023 ]] <<  >> TBD
+
[[Technical_Board_Meeting_Oct_23,_2023 | Technical Board Meeting October 23, 2023 ]] <<  >> [[Technical_Board_Meeting_Mar_12,_2024 | Technical Board Meeting March 12, 2024 ]]
  
 
Online:  see email
 
Online:  see email
Line 19: Line 19:
 
# These risks aren't quite matched in the more expensive bid, which has more machines, and greater capacity to work through, plus can follow original design plan of working with full assembled ring.
 
# These risks aren't quite matched in the more expensive bid, which has more machines, and greater capacity to work through, plus can follow original design plan of working with full assembled ring.
 
# Discussion summary:
 
# Discussion summary:
## Larry will contact Walco to discuss concerns with balky machine, and plans for thermal matching of work pieces.  
+
## After verifying the calculation of required thermal matching, Larry will contact Walco to discuss concerns with balky machine, and plans for thermal matching of work pieces.
 
## If either presents serious concerns, he and KK will re-evaluate whether to use the less expensive option or use the extra $35k for the bid to reduce technical risk.
 
## If either presents serious concerns, he and KK will re-evaluate whether to use the less expensive option or use the extra $35k for the bid to reduce technical risk.
 
## If they judge this acceptable, they will send a message to be forwarded to the technical board describing their assessment of these risks.
 
## If they judge this acceptable, they will send a message to be forwarded to the technical board describing their assessment of these risks.
## Related to that, they will summarize the risk mitigation strategy (as described, modifying rollers if rings mismatched in size, modifiying segments to fit into mis-matching ring sizes, etc.)
+
## Related to that, they will summarize the risk mitigation strategy (as described, modifying rollers if rings mismatched in size, modifiying segments to fit into mis-matching ring sizes, etc.) This documentation will spell out the  the mitigations during assembly and/or operation, including how much the mitigations are expected to alleviate any out of tolerance fabrications.
 
## The TB will aim to respond with a couple of days, so that bids can go out early in week of Jan 29.
 
## The TB will aim to respond with a couple of days, so that bids can go out early in week of Jan 29.
  
 
=Attendance=
 
=Attendance=
  
 +
Present
 
* Kent Paschke, Chair (MOLLER Scientific Coordinator)
 
* Kent Paschke, Chair (MOLLER Scientific Coordinator)
 
* Krishna Kumar (MOLLER Spokesperson)
 
* Krishna Kumar (MOLLER Spokesperson)
Line 32: Line 33:
 
* Ruben Fair (DOE Project Manager)
 
* Ruben Fair (DOE Project Manager)
 
* Klaus Dehmelt (Deputy DOE Project Manager)
 
* Klaus Dehmelt (Deputy DOE Project Manager)
* Michael Gericke (MOLLER-CFI Project Coordinator)
 
 
* Juliette Mammei  (Executive Board International Representative)
 
* Juliette Mammei  (Executive Board International Representative)
 
* Mark Jones  (Hall A Leader)
 
* Mark Jones  (Hall A Leader)
* Paul A Souder (Elected Executive Board Member)
 
 
* David Armstrong (Elected Executive Board Member)
 
* David Armstrong (Elected Executive Board Member)
 
* Robin Wines (Project Engineer)
 
* Robin Wines (Project Engineer)
 
* Dave Meekins  (L2 CAM: Target)
 
* Dave Meekins  (L2 CAM: Target)
* Mike Dion (L2 CAM: Spectrometer)
 
 
* Carl Zorn  (L2 CAM: Detectors)
 
* Carl Zorn  (L2 CAM: Detectors)
 
* Ciprian Gal  (L2 CAM: Infrastructure)
 
* Ciprian Gal  (L2 CAM: Infrastructure)
 
* Robert Michaels  (L2 CAM: DAQ)
 
* Robert Michaels  (L2 CAM: DAQ)
 
* Vladimir Berdnikov  (L2 CAM: Installation)
 
* Vladimir Berdnikov  (L2 CAM: Installation)
* Silviu Covrig (Working Group Convener: Target)
 
* Caryn Palatchi  (Working Group Convener: Polarized Beam)
 
 
* Dustin McNulty  (Working Group Convener: Integrating Detectors)
 
* Dustin McNulty  (Working Group Convener: Integrating Detectors)
* Paul King  (Working Group Convener: DAQ)
 
 
* Nilanga Liyanage  (Working Group Convener: Tracking Detectors)
 
* Nilanga Liyanage  (Working Group Convener: Tracking Detectors)
 
* Jim Napolitano (Working Group Convener: Polarimetry)
 
* Jim Napolitano (Working Group Convener: Polarimetry)
* Rakitha Beminiwattha (Working Group Convener: Simulations)
 
 
* Yury Kolomensky (Working Group Convener: Physics Extraction)
 
* Yury Kolomensky (Working Group Convener: Physics Extraction)
 +
* Larry Bartoszek (presenter)
 +
* Ryan Biraben (designer)
 +
 +
Not available
 +
* Michael Gericke (MOLLER-CFI Project Coordinator)
 +
* Paul A Souder (Elected Executive Board Member)
 +
* Mike Dion (L2 CAM: Spectrometer)
 +
* Silviu Covrig (Working Group Convener: Target)
 +
* Caryn Palatchi  (Working Group Convener: Polarized Beam)
 +
* Paul King  (Working Group Convener: DAQ)
 +
* Rakitha Beminiwattha (Working Group Convener: Simulations)

Latest revision as of 14:58, 5 March 2024

Back to Main Page >> Technical Board

Technical Board Meeting October 23, 2023 << >> Technical Board Meeting March 12, 2024

Online: see email

Agenda

  • Detector support structure acquisition [Larry Bartoszek]

Minutes

The presentation is available on the project sharepoint, to avoid publically posting bidding particulars.

  1. Two bid packages, one for the frames for the individual segments, one for the ring assembly that will hold the segments
  2. Segment best bit from Meyer Tool. No worries on capability or schedule.
  3. Ring assembly is challenge in large size: design assumes two-half rings are assembled before drilling hole patterns.
  4. Low bid (Walco) must work with half-rings only. They are credible and experienced. Next highest bidder is $35k more expensive.
  5. Technical risk: tight tolerances on hole pattern in two half-rings, and between the three rings.
    1. Requires matching temperature for this work, estimated about 4deg C across the length of ring to meet quoted tolerance.
  6. Technical Risk: Walco has two suitable CNC machines, one is flaky. If it doesn't work, they may have limited capacity for this plus core customer jobs.
  7. These risks aren't quite matched in the more expensive bid, which has more machines, and greater capacity to work through, plus can follow original design plan of working with full assembled ring.
  8. Discussion summary:
    1. After verifying the calculation of required thermal matching, Larry will contact Walco to discuss concerns with balky machine, and plans for thermal matching of work pieces.
    2. If either presents serious concerns, he and KK will re-evaluate whether to use the less expensive option or use the extra $35k for the bid to reduce technical risk.
    3. If they judge this acceptable, they will send a message to be forwarded to the technical board describing their assessment of these risks.
    4. Related to that, they will summarize the risk mitigation strategy (as described, modifying rollers if rings mismatched in size, modifiying segments to fit into mis-matching ring sizes, etc.) This documentation will spell out the the mitigations during assembly and/or operation, including how much the mitigations are expected to alleviate any out of tolerance fabrications.
    5. The TB will aim to respond with a couple of days, so that bids can go out early in week of Jan 29.

Attendance

Present

  • Kent Paschke, Chair (MOLLER Scientific Coordinator)
  • Krishna Kumar (MOLLER Spokesperson)
  • Mark Pitt (Deputy Spokesperson, MOLLER-NSF Project Coordinator)
  • Ruben Fair (DOE Project Manager)
  • Klaus Dehmelt (Deputy DOE Project Manager)
  • Juliette Mammei (Executive Board International Representative)
  • Mark Jones (Hall A Leader)
  • David Armstrong (Elected Executive Board Member)
  • Robin Wines (Project Engineer)
  • Dave Meekins (L2 CAM: Target)
  • Carl Zorn (L2 CAM: Detectors)
  • Ciprian Gal (L2 CAM: Infrastructure)
  • Robert Michaels (L2 CAM: DAQ)
  • Vladimir Berdnikov (L2 CAM: Installation)
  • Dustin McNulty (Working Group Convener: Integrating Detectors)
  • Nilanga Liyanage (Working Group Convener: Tracking Detectors)
  • Jim Napolitano (Working Group Convener: Polarimetry)
  • Yury Kolomensky (Working Group Convener: Physics Extraction)
  • Larry Bartoszek (presenter)
  • Ryan Biraben (designer)

Not available

  • Michael Gericke (MOLLER-CFI Project Coordinator)
  • Paul A Souder (Elected Executive Board Member)
  • Mike Dion (L2 CAM: Spectrometer)
  • Silviu Covrig (Working Group Convener: Target)
  • Caryn Palatchi (Working Group Convener: Polarized Beam)
  • Paul King (Working Group Convener: DAQ)
  • Rakitha Beminiwattha (Working Group Convener: Simulations)