Difference between revisions of "Optics Meeting Oct 11 2023 1100AM ET"

From Moller Wiki
Jump to: navigation, search
(Minutes)
(Minutes)
Line 16: Line 16:
 
# remoll updates (Bill): now has 4 layers of GEMs: G10 frames, G10 spacer ribs, ArCO2 active volume, trigger scintillators. Now have fixed any overlaps with Rotator rings, beam pipe, support legs. Checked into a branch, ready for git Push, so Kate can look at. Diajon James (SBU student) also plans to look at photon hits etc. in GEMs. Haven't yet checked effect of adding these on CPU/event. Should be able "rotate" in GDML using a 2-macro (zero degrees, i.e. center of open sectors is default location).  
 
# remoll updates (Bill): now has 4 layers of GEMs: G10 frames, G10 spacer ribs, ArCO2 active volume, trigger scintillators. Now have fixed any overlaps with Rotator rings, beam pipe, support legs. Checked into a branch, ready for git Push, so Kate can look at. Diajon James (SBU student) also plans to look at photon hits etc. in GEMs. Haven't yet checked effect of adding these on CPU/event. Should be able "rotate" in GDML using a 2-macro (zero degrees, i.e. center of open sectors is default location).  
 
# Dealing with v_z dependence in reconstruction algorithm (Vassu,Zuhal) - they are starting on this.  
 
# Dealing with v_z dependence in reconstruction algorithm (Vassu,Zuhal) - they are starting on this.  
# Acceptance function (Hanjie).
+
# Acceptance function (Hanjie) [https://moller.jlab.org/wiki/images/Acceptance_function.pdf]
  
 
=Meeting link information=
 
=Meeting link information=
  
 
See email invitation, or contact David Armstrong, Kate Evans or Jennifer McAllister for Zoom link
 
See email invitation, or contact David Armstrong, Kate Evans or Jennifer McAllister for Zoom link

Revision as of 15:07, 30 October 2023

Back to Main Page >> Optics Meetings

>> following meeting

>> previous meeting

Agenda

1. GEMs and TS into remoll (Bill)

2. Analyzing power (Hanjie Liu)

Attendance

David, Andrew, Kate, Paul S;, Hanjie, Zuhal, Bill, Vassu, Sakib, Sayak, Tyler, Kent, Juliette

Minutes

  1. remoll updates (Bill): now has 4 layers of GEMs: G10 frames, G10 spacer ribs, ArCO2 active volume, trigger scintillators. Now have fixed any overlaps with Rotator rings, beam pipe, support legs. Checked into a branch, ready for git Push, so Kate can look at. Diajon James (SBU student) also plans to look at photon hits etc. in GEMs. Haven't yet checked effect of adding these on CPU/event. Should be able "rotate" in GDML using a 2-macro (zero degrees, i.e. center of open sectors is default location).
  2. Dealing with v_z dependence in reconstruction algorithm (Vassu,Zuhal) - they are starting on this.
  3. Acceptance function (Hanjie) [1]

Meeting link information

See email invitation, or contact David Armstrong, Kate Evans or Jennifer McAllister for Zoom link