Difference between revisions of "Optics Meeting Oct 11 2023 1100AM ET"
From Moller Wiki
(→Agenda) |
(→Minutes) |
||
Line 14: | Line 14: | ||
=Minutes= | =Minutes= | ||
+ | # remoll updates (Bill): now has 4 layers of GEMs: G10 frames, G10 spacer ribs, ArCO2 active volume, trigger scintillators. Now have fixed any overlaps with Rotator rings, beam pipe, support legs. Checked into a branch, ready to Push, so can can look at. | ||
=Meeting link information= | =Meeting link information= | ||
See email invitation, or contact David Armstrong, Kate Evans or Jennifer McAllister for Zoom link | See email invitation, or contact David Armstrong, Kate Evans or Jennifer McAllister for Zoom link |
Revision as of 14:57, 30 October 2023
Back to Main Page >> Optics Meetings
Contents
[hide]Agenda
1. GEMs and TS into remoll (Bill)
2. Analyzing power (Hanjie Liu)
Attendance
David, Andrew, Kate, Paul S;, Hanjie, Zuhal, Bill, Vassu, Sakib, Sayak, Tyler, Kent, Juliette
Minutes
- remoll updates (Bill): now has 4 layers of GEMs: G10 frames, G10 spacer ribs, ArCO2 active volume, trigger scintillators. Now have fixed any overlaps with Rotator rings, beam pipe, support legs. Checked into a branch, ready to Push, so can can look at.
Meeting link information
See email invitation, or contact David Armstrong, Kate Evans or Jennifer McAllister for Zoom link