Difference between revisions of "Optics Meeting Oct 11 2023 1100AM ET"

From Moller Wiki
Jump to: navigation, search
(Agenda)
(Minutes)
Line 14: Line 14:
  
 
=Minutes=
 
=Minutes=
 +
# remoll updates (Bill): now has 4 layers of GEMs: G10 frames, G10 spacer ribs, ArCO2 active volume, trigger scintillators. Now have fixed any overlaps with Rotator rings, beam pipe, support legs. Checked into a branch, ready to Push, so can can look at.
  
 
=Meeting link information=
 
=Meeting link information=
  
 
See email invitation, or contact David Armstrong, Kate Evans or Jennifer McAllister for Zoom link
 
See email invitation, or contact David Armstrong, Kate Evans or Jennifer McAllister for Zoom link

Revision as of 14:57, 30 October 2023

Back to Main Page >> Optics Meetings

>> following meeting

>> previous meeting

Agenda

1. GEMs and TS into remoll (Bill)

2. Analyzing power (Hanjie Liu)

Attendance

David, Andrew, Kate, Paul S;, Hanjie, Zuhal, Bill, Vassu, Sakib, Sayak, Tyler, Kent, Juliette

Minutes

  1. remoll updates (Bill): now has 4 layers of GEMs: G10 frames, G10 spacer ribs, ArCO2 active volume, trigger scintillators. Now have fixed any overlaps with Rotator rings, beam pipe, support legs. Checked into a branch, ready to Push, so can can look at.

Meeting link information

See email invitation, or contact David Armstrong, Kate Evans or Jennifer McAllister for Zoom link