Difference between revisions of "Simulation Meeting August 31 2023 11AM ET"
From Moller Wiki
(→Minutes) |
(→Minutes) |
||
(One intermediate revision by the same user not shown) | |||
Line 24: | Line 24: | ||
** Coil dose: Sakib | ** Coil dose: Sakib | ||
* Be Vacuum window simulation project needs help | * Be Vacuum window simulation project needs help | ||
+ | * From June 2023: General discussion on possible topics of interest in near term | ||
+ | ** GEM coverage for tracks to R1 (probably no coverage) and R2. We'd like to know how well we can look at illumination of these monitors | ||
+ | ** Detector response studies | ||
+ | *** Wedge response in optical simulation. Important for deconvolution, can be studied later but would be timely now to prepare for probable beam test in September | ||
+ | *** Funnel background - same. Blackened quartz might be used in upcoming beam test, it would be helpful to have a simulation guide to plan. |
Latest revision as of 18:11, 1 September 2023
Back to Main Page >> Simulation Meetings
previous meeting << >> following meeting
Agenda
- Go over current simulation tasks
Attendance
Minutes
- UVA:
- Prakash: a survey of background usual tabulation of background, Sakib: coil dose near col-5 or modification to coil shield
- Eric: ferromagnetic study, improve the workflow so others can run the study
- SBU:
- Jhih-Ying; Fluka simulation to get local activation
- Zuhal: Al/Be exit window simulation working with Ciprian first study is how Al exit window background affects the deconvolution
- VaTech
- Devi: Simulation for halo monitor and work on engineering needs for this project
- Manitoba
- Coil dose: Sakib
- Be Vacuum window simulation project needs help
- From June 2023: General discussion on possible topics of interest in near term
- GEM coverage for tracks to R1 (probably no coverage) and R2. We'd like to know how well we can look at illumination of these monitors
- Detector response studies
- Wedge response in optical simulation. Important for deconvolution, can be studied later but would be timely now to prepare for probable beam test in September
- Funnel background - same. Blackened quartz might be used in upcoming beam test, it would be helpful to have a simulation guide to plan.