Difference between revisions of "CountingDaq 230428"
From Moller Wiki
(Created page with "__NOTOC__ Back to Main Page >> Data Acquisition Meetings >> Counting mode DAQ meetings Counting...") |
|||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
Back to [[Main_Page|Main Page]] >> [[DAQ Meetings|Data Acquisition Meetings]] >> [[DAQ Meetings#Counting mode DAQ meetings|Counting mode DAQ meetings]] | Back to [[Main_Page|Main Page]] >> [[DAQ Meetings|Data Acquisition Meetings]] >> [[DAQ Meetings#Counting mode DAQ meetings|Counting mode DAQ meetings]] | ||
− | [[CountingDaq_230331 | previous meeting]] << >> [[ | + | [[CountingDaq_230331 | previous meeting]] << >> [[CountingDaq_230512 | following meeting]] |
== Meeting information == | == Meeting information == | ||
Line 22: | Line 22: | ||
== Minutes == | == Minutes == | ||
− | Recording on Zoom: | + | Recording on Zoom: [https://jlab-org.zoomgov.com/rec/share/cUk4muZC0y1wY7Ia5SIojIDxelUschCkAFarqp8wUJt6C1m4-Xmt6Qw9Xd2ejOst.tl3yxVECDVKOA6gM?startTime=1682697354000] |
+ | |||
+ | Participants: B. Moffitt, P. King, R. Michaels, D. Armstrong, S. Chatterjee, M. Gericke, D. McNulty | ||
+ | |||
+ | * Paul: I had reached out to Klaus about the VXS crate spec for setting up a GEM-to-VTP readout. They don't have funds for the crate right now, so we'd probably need to loan one to them when we get to that point. | ||
+ | * Discussion of the fiber run for the MPD readout. We haven't had a definitive estimate for this fiber run. This is probably 100m. We expect this would be within the DAQ budget. | ||
+ | * Discussion of the fiber run for the HVMAPS. Each of the 84 tiles will have a MTP connector (only 5 of the 12 fibers are used). We should consider if we want to run 84 individual cables or use a higher-density trunk. | ||
+ | * Jie is working on the (hopefully) last redesign of the base+amplifiers. | ||
+ | ** David will get in touch with Jie about what modifications are possible to use the amplifiers with the smaller PMTs for the pion detector | ||
+ | * I have a summer student (Ryan Conaway) who I plan to have working on the VTP triggering design | ||
+ | ** Bryan can copy the library updates from NPS into the Compton test stand system | ||
+ | ** Then Bryan can help Ryan and I get familiar with how to set up the VTP firmware |
Latest revision as of 14:48, 12 May 2023
Back to Main Page >> Data Acquisition Meetings >> Counting mode DAQ meetings
previous meeting << >> following meeting
Meeting information
Meeting time: 12:00pm Eastern Zoom connection information Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1603800887?pwd=aXVmSnN6aWZWN3RBdXB4RUhGckZJdz09 Meeting ID: 160 380 0887 Passcode: 903612 US Tool free phone: (833) 568 8864 Find your local number: https://jlab-org.zoomgov.com/u/ab8341cjcG
Agenda
- Activity updates
- General discussion
Minutes
Recording on Zoom: [1]
Participants: B. Moffitt, P. King, R. Michaels, D. Armstrong, S. Chatterjee, M. Gericke, D. McNulty
- Paul: I had reached out to Klaus about the VXS crate spec for setting up a GEM-to-VTP readout. They don't have funds for the crate right now, so we'd probably need to loan one to them when we get to that point.
- Discussion of the fiber run for the MPD readout. We haven't had a definitive estimate for this fiber run. This is probably 100m. We expect this would be within the DAQ budget.
- Discussion of the fiber run for the HVMAPS. Each of the 84 tiles will have a MTP connector (only 5 of the 12 fibers are used). We should consider if we want to run 84 individual cables or use a higher-density trunk.
- Jie is working on the (hopefully) last redesign of the base+amplifiers.
- David will get in touch with Jie about what modifications are possible to use the amplifiers with the smaller PMTs for the pion detector
- I have a summer student (Ryan Conaway) who I plan to have working on the VTP triggering design
- Bryan can copy the library updates from NPS into the Compton test stand system
- Then Bryan can help Ryan and I get familiar with how to set up the VTP firmware