== Minutes ==
 
== Minutes ==
Recording at zoomgov:   
+
Recording at zoomgov:  [https://jlab-org.zoomgov.com/rec/share/MV6gWtOV-Eiz2pt2uNW9-vDFhGcNNItVQLkAEqpl3DNgcxnI8_XeXHtE7AF2H_Dr.yqfxPA2HDhQGuPIw]
  
Participants:
+
Participants: B. Moffit, P. King, R. Michaels, M. Gericke, D. McNulty, C. Cuevas, D. Bishop, J. Pan, S. Chatterjee, C. Zorn, B. Li
 +
 
 +
*  Activity reports
 +
**  Bryan:  The new firmware has been tested, and William verified that the trigger acknowledge is getting back to the TIpcie
 +
**  Daryl:  He has the equipment he needs to check the signal integrity on all the ADCs, but hasn't started looking at that yet. 
 +
**  Michael:  Brynne has gotten set up to do the follow up studies on the
 +
**  Paul and Chris discuss the fiber pull for the TI connection.  We'll move forward with a 48-fiber trunk (which gives 12 full MTP QSFP connections available).  Paul and Chris are working to get this set up
 +
**  Bob:  He had handed off the TIpcie for shipping to Michael
 +
**  Michael
 +
***  All of the ADC chips have been ordered; 435 will be arriving in April, with the remaining 205 will be shipped in September
 +
***  Discussion of the bandwidth of the ADC input stage filter, to make it the limiting factor
 +
****  Daryl says he thinks the amplifier bandwidth is actually a little higher than the 1 MHz of the input stage.
 +
**  Discussion of the long cables
 +
***  Jie had used cables of 100m in the bench testing; Dustin says that the path is likely to be about 75m, so testing with 100m should be sufficient
 +
***  Michael will suggest to Brynne to take a look at the bandwidth with both short cables and the 100m cable to see what impact that has

Revision as of 13:55, 7 April 2023

Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings

previous meeting << >> following meeting

Meeting information

 Meeting time:  12:00pm Eastern
 
 Zoom connection information
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1603800887?pwd=aXVmSnN6aWZWN3RBdXB4RUhGckZJdz09
 
 Meeting ID: 160 380 0887
 Passcode: 903612
 US Tool free phone: (833) 568 8864
 Find your local number: https://jlab-org.zoomgov.com/u/ab8341cjcG

Agenda

  • Activity updates
  • General discussion

Open Issues to be followed up later

  1. Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
  2. Draft timing diagram: DocDB 790
  3. Michael, Bob, Brynne, and Paul should put together a list of the integrator running modes we would like to have available

Minutes

Recording at zoomgov: [1]

Participants: B. Moffit, P. King, R. Michaels, M. Gericke, D. McNulty, C. Cuevas, D. Bishop, J. Pan, S. Chatterjee, C. Zorn, B. Li

  • Activity reports
    • Bryan: The new firmware has been tested, and William verified that the trigger acknowledge is getting back to the TIpcie
    • Daryl: He has the equipment he needs to check the signal integrity on all the ADCs, but hasn't started looking at that yet.
    • Michael: Brynne has gotten set up to do the follow up studies on the
    • Paul and Chris discuss the fiber pull for the TI connection. We'll move forward with a 48-fiber trunk (which gives 12 full MTP QSFP connections available). Paul and Chris are working to get this set up
    • Bob: He had handed off the TIpcie for shipping to Michael
    • Michael
      • All of the ADC chips have been ordered; 435 will be arriving in April, with the remaining 205 will be shipped in September
      • Discussion of the bandwidth of the ADC input stage filter, to make it the limiting factor
        • Daryl says he thinks the amplifier bandwidth is actually a little higher than the 1 MHz of the input stage.
    • Discussion of the long cables
      • Jie had used cables of 100m in the bench testing; Dustin says that the path is likely to be about 75m, so testing with 100m should be sufficient
      • Michael will suggest to Brynne to take a look at the bandwidth with both short cables and the 100m cable to see what impact that has