Recording at zoomgov:   
+
Recording at zoomgov:  [https://jlab-org.zoomgov.com/rec/share/CwwPZLcL9axHpTprFLM9QRPpjxKFgHBWIso_ltS0op02L3d2gdMXeF8_L7at2BOm.GP8-C1NpVfDWMf8X?startTime=1678467345000]
  
Participants:
+
Participants: R. Michaels, B. Moffit, W. Gu, P. King, D. Bishop, J. Pan, B. Blaikie, M. Gericke, C. Zorn, B. Shaw, D. McNulty
 +
 
 +
*  Activity updates
 +
**  William:  He and Bryan had tried to load the new firmware, but it had actually still been the previous version
 +
***  Update by the end of the meeting:  Bryerton had found there had been a compilation error, had fixed it, and has now sent a new link  for the new firmware
 +
**  Michael:  He has placed the order for 640 ADC chips (enough for 40 new modules).
 +
**  Discussion about the frequency rolloff that Brynne had presented last meeting
 +
***  Brynne had a few follow-up bench tests suggested last time, but hasn't had time to do them yet
 +
***  Daryl is getting a precision signal generator in order to do similar testing at TRIUMF; the signal generators they had weren't clean enough to really do the testing they wanted to do
 +
**  Bob:  He's been working with the V2495 and suggests that we might be able to get CAEN to make the firmware to do the data transfer and integration
 +
**  Michael asks if he an get a TI-pcie card from the lab.  After the meeting, William and Bob follow up to get one sent to him.

Latest revision as of 16:07, 23 March 2023

Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings

previous meeting << >> following meeting

Meeting information

 Meeting time:  12:00pm Eastern
 
 Zoom connection information
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1603800887?pwd=aXVmSnN6aWZWN3RBdXB4RUhGckZJdz09
 
 Meeting ID: 160 380 0887
 Passcode: 903612
 US Tool free phone: (833) 568 8864
 Find your local number: https://jlab-org.zoomgov.com/u/ab8341cjcG

Agenda

  • Activity updates
  • General discussion

Open Issues to be followed up later

  1. Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
  2. Draft timing diagram: DocDB 790
  3. Michael, Bob, Brynne, and Paul should put together a list of the integrator running modes we would like to have available

Minutes

Recording at zoomgov: [1]

Participants: R. Michaels, B. Moffit, W. Gu, P. King, D. Bishop, J. Pan, B. Blaikie, M. Gericke, C. Zorn, B. Shaw, D. McNulty

  • Activity updates
    • William: He and Bryan had tried to load the new firmware, but it had actually still been the previous version
      • Update by the end of the meeting: Bryerton had found there had been a compilation error, had fixed it, and has now sent a new link for the new firmware
    • Michael: He has placed the order for 640 ADC chips (enough for 40 new modules).
    • Discussion about the frequency rolloff that Brynne had presented last meeting
      • Brynne had a few follow-up bench tests suggested last time, but hasn't had time to do them yet
      • Daryl is getting a precision signal generator in order to do similar testing at TRIUMF; the signal generators they had weren't clean enough to really do the testing they wanted to do
    • Bob: He's been working with the V2495 and suggests that we might be able to get CAEN to make the firmware to do the data transfer and integration
    • Michael asks if he an get a TI-pcie card from the lab. After the meeting, William and Bob follow up to get one sent to him.