Recording at zoomgov: [https://jlab-org.zoomgov.com/rec/share/-jVDe7ea9rfIzMS5NVP51Xm9R4VqA4RwvnCwlfLLw0ULz_lwphkJDVnm8JV3gj56.4C6qeYOvjXPB5wmC?startTime=1654271674000] | Recording at zoomgov: [https://jlab-org.zoomgov.com/rec/share/-jVDe7ea9rfIzMS5NVP51Xm9R4VqA4RwvnCwlfLLw0ULz_lwphkJDVnm8JV3gj56.4C6qeYOvjXPB5wmC?startTime=1654271674000] | ||
− | Participants: | + | Participants: B. Shaw, C. Zorn, R. Michaels, B. Moffit, B. Blaikie, M. Gericke, D. Bishop, J. Pan, W. Gu, P. King |
+ | |||
+ | * Bryerton: He was working on other projects so didn't put much work in on the ADC | ||
+ | ** He has received the TI routines from Bryan and William, but hasn't had a chance to work on it yet. | ||
+ | ** Some reworking of the kernel modules and DMA code | ||
+ | ** He has ordered the Comblock 10Gig IP | ||
+ | * Bob: There is some operations money available that he plans to use to set up the digital BCM project and the polarimeter DAQ systems | ||
+ | * Michael | ||
+ | ** The ADC worked really well at the beamtest | ||
+ | ** The replacement amps for the ADC boards are likely arriving in August, so that's when the boards would become available | ||
+ | ** The PoE was really nice to work with, and so we might use that for the installed ADCs also; we'll need to think about how this might impact our grounding plan | ||
+ | ** The standard ethernet will be used for slow controls too; the main data transfer will be through the QSFP though | ||
+ | ** The preamplifiers had noise coming from both DC-DC converters and a potentiometer for adjusting gains/offsets | ||
+ | *** We'll need careful definition of power supplies, and to use fixed gain resistors to avoid both of these. | ||
+ | * Brynne: Shows photos of the new PMT support system |
Latest revision as of 20:42, 6 July 2022
Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings
previous meeting << >> following meeting
Meeting information
Meeting time: 12:00pm Eastern Zoom connection information Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1603800887?pwd=aXVmSnN6aWZWN3RBdXB4RUhGckZJdz09 Meeting ID: 160 380 0887 Passcode: 903612 US Tool free phone: (833) 568 8864 Find your local number: https://jlab-org.zoomgov.com/u/ab8341cjcG
Agenda
- Activity updates
- General discussion
Open Issues to be followed up later
- Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
- Draft timing diagram: DocDB 790
- Michael, Bob, Brynne, and Paul should put together a list of the integrator running modes we would like to have available
Minutes
Recording at zoomgov: [1]
Participants: B. Shaw, C. Zorn, R. Michaels, B. Moffit, B. Blaikie, M. Gericke, D. Bishop, J. Pan, W. Gu, P. King
- Bryerton: He was working on other projects so didn't put much work in on the ADC
- He has received the TI routines from Bryan and William, but hasn't had a chance to work on it yet.
- Some reworking of the kernel modules and DMA code
- He has ordered the Comblock 10Gig IP
- Bob: There is some operations money available that he plans to use to set up the digital BCM project and the polarimeter DAQ systems
- Michael
- The ADC worked really well at the beamtest
- The replacement amps for the ADC boards are likely arriving in August, so that's when the boards would become available
- The PoE was really nice to work with, and so we might use that for the installed ADCs also; we'll need to think about how this might impact our grounding plan
- The standard ethernet will be used for slow controls too; the main data transfer will be through the QSFP though
- The preamplifiers had noise coming from both DC-DC converters and a potentiometer for adjusting gains/offsets
- We'll need careful definition of power supplies, and to use fixed gain resistors to avoid both of these.
- Brynne: Shows photos of the new PMT support system