Difference between revisions of "IntegrationDaq 220520"

From Moller Wiki
Jump to: navigation, search
(Created page with "__NOTOC__ Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings In...")
 
(Minutes)
 
Line 26: Line 26:
  
 
== Minutes ==
 
== Minutes ==
Recording at zoomgov:   
+
Recording at zoomgov:  [https://jlab-org.zoomgov.com/rec/share/pdFdccgYZCH7j-vkb_8Ij1Sx-q6TASXV629HhvNNncgbnTsasxDQVZ5fWVYEoEq4.FdTHHmkA75rLVnw_?startTime=1653062103000]
  
Participants:
+
Participants: R. Michaels, B. Moffit, B. Shaw, D. Bishop, J. Pan, W. Gu, J. Fast, C. Zorn, P. King
 +
 
 +
*  There had been a small group discussion on Wednesday (Bryerton, Bryan, Bob, Michael, William, and Paul) to discuss the next steps for the TI client on the ADC module.
 +
**  Bryan will prepare a document of what registers need to be set on the TI on the ADC to be a client to the external TI, so that Bryerton can verify the TI connection is working properly
 +
**  Bryerton will document the registers to configure the ADC parameters and how to do a DMA of the event data from the ADC
 +
*  Bryerton had discussed the data QSFP with Michael
 +
**  TRIUMF will buy the 10Gig IP for the QSFP
 +
**  William suggests setting it up to use one link at 10Gig, to allow the possibility of using all four to get 40Gig
 +
**  William suggests using the Finisar ftl410qe4c QFSP transciver; JLab has used these in the halls and they have good reliability
 +
*  Paul needs to follow up with the CC and Chris Cuevas about using the prototype ADC in the TEDF
 +
**  Paul had heard from the CC that the switches in TEDF can support PoE; he will check that PoE++ is supported
 +
**  Paul has reached out to Chris about what electrical safety review is needed to bring the module on site; Chris is out on vacation until beginning of June.  His initial thought (while on vacation) is that the device is not Class-II and formal registration won't be needed, but he will check
 +
*  Follow up from the beam monitor meeting with John Musson et al.:  we will likely have many beam monitors still instrumented with the exisiting SEE modules, so we would still need to have some integrators set up to record the few-volt single-ended signals.  We will also be working to use the digital data stream from the new instrumentation modules

Latest revision as of 17:54, 2 June 2022

Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings

previous meeting << >> following meeting

Meeting information

 Meeting time:  12:00pm Eastern
 
 Zoom connection information
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1603800887?pwd=aXVmSnN6aWZWN3RBdXB4RUhGckZJdz09
 
 Meeting ID: 160 380 0887
 Passcode: 903612
 US Tool free phone: (833) 568 8864
 Find your local number: https://jlab-org.zoomgov.com/u/ab8341cjcG

Agenda

  • Activity updates
  • General discussion

Open Issues to be followed up later

  1. Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
  2. Draft timing diagram: DocDB 790
  3. Michael, Bob, Brynne, and Paul should put together a list of the integrator running modes we would like to have available

Minutes

Recording at zoomgov: [1]

Participants: R. Michaels, B. Moffit, B. Shaw, D. Bishop, J. Pan, W. Gu, J. Fast, C. Zorn, P. King

  • There had been a small group discussion on Wednesday (Bryerton, Bryan, Bob, Michael, William, and Paul) to discuss the next steps for the TI client on the ADC module.
    • Bryan will prepare a document of what registers need to be set on the TI on the ADC to be a client to the external TI, so that Bryerton can verify the TI connection is working properly
    • Bryerton will document the registers to configure the ADC parameters and how to do a DMA of the event data from the ADC
  • Bryerton had discussed the data QSFP with Michael
    • TRIUMF will buy the 10Gig IP for the QSFP
    • William suggests setting it up to use one link at 10Gig, to allow the possibility of using all four to get 40Gig
    • William suggests using the Finisar ftl410qe4c QFSP transciver; JLab has used these in the halls and they have good reliability
  • Paul needs to follow up with the CC and Chris Cuevas about using the prototype ADC in the TEDF
    • Paul had heard from the CC that the switches in TEDF can support PoE; he will check that PoE++ is supported
    • Paul has reached out to Chris about what electrical safety review is needed to bring the module on site; Chris is out on vacation until beginning of June. His initial thought (while on vacation) is that the device is not Class-II and formal registration won't be needed, but he will check
  • Follow up from the beam monitor meeting with John Musson et al.: we will likely have many beam monitors still instrumented with the exisiting SEE modules, so we would still need to have some integrators set up to record the few-volt single-ended signals. We will also be working to use the digital data stream from the new instrumentation modules