Difference between revisions of "IntegrationDaq 220520"
From Moller Wiki
(Created page with "__NOTOC__ Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings In...") |
(→Minutes) |
||
Line 26: | Line 26: | ||
== Minutes == | == Minutes == | ||
− | Recording at zoomgov: | + | Recording at zoomgov: [https://jlab-org.zoomgov.com/rec/share/pdFdccgYZCH7j-vkb_8Ij1Sx-q6TASXV629HhvNNncgbnTsasxDQVZ5fWVYEoEq4.FdTHHmkA75rLVnw_?startTime=1653062103000] |
− | Participants: | + | Participants: R. Michaels, B. Moffit, B. Shaw, D. Bishop, J. Pan, W. Gu, J. Fast, C. Zorn, P. King |
+ | |||
+ | * There had been a small group discussion on Wednesday (Bryerton, Bryan, Bob, Michael, William, and Paul) to discuss the next steps for the TI client on the ADC module. | ||
+ | ** Bryan will prepare a document of what registers need to be set on the TI on the ADC to be a client to the external TI, so that Bryerton can verify the TI connection is working properly | ||
+ | ** Bryerton will document the registers to configure the ADC parameters and how to do a DMA of the event data from the ADC | ||
+ | * Bryerton had discussed the data QSFP with Michael | ||
+ | ** TRIUMF will buy the 10Gig IP for the QSFP | ||
+ | ** William suggests setting it up to use one link at 10Gig, to allow the possibility of using all four to get 40Gig | ||
+ | ** William suggests using the Finisar ftl410qe4c QFSP transciver; JLab has used these in the halls and they have good reliability | ||
+ | * Paul needs to follow up with the CC and Chris Cuevas about using the prototype ADC in the TEDF | ||
+ | ** Paul had heard from the CC that the switches in TEDF can support PoE; he will check that PoE++ is supported | ||
+ | ** Paul has reached out to Chris about what electrical safety review is needed to bring the module on site; Chris is out on vacation until beginning of June. His initial thought (while on vacation) is that the device is not Class-II and formal registration won't be needed, but he will check | ||
+ | * Follow up from the beam monitor meeting with John Musson et al.: we will likely have many beam monitors still instrumented with the exisiting SEE modules, so we would still need to have some integrators set up to record the few-volt single-ended signals. We will also be working to use the digital data stream from the new instrumentation modules |
Latest revision as of 17:54, 2 June 2022
Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings
previous meeting << >> following meeting
Meeting information
Meeting time: 12:00pm Eastern Zoom connection information Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1603800887?pwd=aXVmSnN6aWZWN3RBdXB4RUhGckZJdz09 Meeting ID: 160 380 0887 Passcode: 903612 US Tool free phone: (833) 568 8864 Find your local number: https://jlab-org.zoomgov.com/u/ab8341cjcG
Agenda
- Activity updates
- General discussion
Open Issues to be followed up later
- Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
- Draft timing diagram: DocDB 790
- Michael, Bob, Brynne, and Paul should put together a list of the integrator running modes we would like to have available
Minutes
Recording at zoomgov: [1]
Participants: R. Michaels, B. Moffit, B. Shaw, D. Bishop, J. Pan, W. Gu, J. Fast, C. Zorn, P. King
- There had been a small group discussion on Wednesday (Bryerton, Bryan, Bob, Michael, William, and Paul) to discuss the next steps for the TI client on the ADC module.
- Bryan will prepare a document of what registers need to be set on the TI on the ADC to be a client to the external TI, so that Bryerton can verify the TI connection is working properly
- Bryerton will document the registers to configure the ADC parameters and how to do a DMA of the event data from the ADC
- Bryerton had discussed the data QSFP with Michael
- TRIUMF will buy the 10Gig IP for the QSFP
- William suggests setting it up to use one link at 10Gig, to allow the possibility of using all four to get 40Gig
- William suggests using the Finisar ftl410qe4c QFSP transciver; JLab has used these in the halls and they have good reliability
- Paul needs to follow up with the CC and Chris Cuevas about using the prototype ADC in the TEDF
- Paul had heard from the CC that the switches in TEDF can support PoE; he will check that PoE++ is supported
- Paul has reached out to Chris about what electrical safety review is needed to bring the module on site; Chris is out on vacation until beginning of June. His initial thought (while on vacation) is that the device is not Class-II and formal registration won't be needed, but he will check
- Follow up from the beam monitor meeting with John Musson et al.: we will likely have many beam monitors still instrumented with the exisiting SEE modules, so we would still need to have some integrators set up to record the few-volt single-ended signals. We will also be working to use the digital data stream from the new instrumentation modules