Difference between revisions of "CountingDaq 220429"
From Moller Wiki
(→Minutes) |
|||
(2 intermediate revisions by 2 users not shown) | |||
Line 18: | Line 18: | ||
== Agenda == | == Agenda == | ||
* "Digital BCM readout: what was done and what could be done at JLab" -- Bob M. | * "Digital BCM readout: what was done and what could be done at JLab" -- Bob M. | ||
+ | https://userweb.jlab.org/~rom/digibcm/DigiMonStatus.pdf | ||
* Activity updates | * Activity updates | ||
* Thoughts about getting ready for 90% review | * Thoughts about getting ready for 90% review | ||
Line 23: | Line 24: | ||
** HDMI cable length tests; decision on MPD position; radiation environment evaluation for MPDs | ** HDMI cable length tests; decision on MPD position; radiation environment evaluation for MPDs | ||
** Availability of Hanjie's SOLID test stand firmware as reference/example for VTP trigger definition? | ** Availability of Hanjie's SOLID test stand firmware as reference/example for VTP trigger definition? | ||
+ | *** Available at https://github.com/hanjie1/solid_ecal | ||
** Follow-up with grounding working group? | ** Follow-up with grounding working group? | ||
** Beam monitor requirements for counting mode and how to instrument? | ** Beam monitor requirements for counting mode and how to instrument? | ||
Line 29: | Line 31: | ||
== Minutes == | == Minutes == | ||
− | Recording on Zoom: | + | Recording on Zoom: [https://jlab-org.zoomgov.com/rec/share/yDVbOmt5SyTJiDEAYXxBoyfs-Z3BJr1D07oeC3l54gV_FRjt-Vj5EuuIu5OHseBk.xczDhn1-yC9rHgXk?startTime=1651247439000] |
− | Participants: | + | Participants: R. Michaels, C. Ghosh, D. Armstrong, P. King, C. Zorn, D. McNulty, B. Moffit |
+ | |||
+ | * Discussion of previous work on JLab digital beam monitors | ||
+ | ** Chad and Randall had previously had a system to send digital data, a 24-bit word at 10ksps, from a BCM to a V1495. The V1495 accumulated these data words to produce the charge integral over a CODA run | ||
+ | ** Bob and I will follow up with John and Chad Seaton about the path to develop a system that would meet our needs. | ||
+ | * Activity updates | ||
+ | ** Paul has restored the server for his test stand at OU (after a major server crash) | ||
+ | ** Bob now has a VTP in his TEDF test stand, but hasn't started working with it yet. | ||
+ | *** We have Hanjie's github repo with the SOLID VTP test stand firmware, and Bob is also following the development of the HCAL VTP firmware | ||
+ | ** David hasn't received the HDMI cables for the length study yet | ||
+ | ** David is working to get xray fluxes at the GEMs, to be able to see if that will cause significant changes in our rates. He may have a result in a few weeks | ||
+ | * Discussion of what to do for 90% review | ||
+ | ** We haven't put in the change request to take the VETROC out of our design. | ||
+ | *** David suggests bringing Mark P. into the discussion about removing the VETROC to see if some of the diagnostic channels need the better timing. | ||
+ | *** In our previous plan, we had specified the JLab discriminator/scaler modules that were clocked at 125MHz, so to benefit from the better time resolution we'd need to specify different discriminators | ||
+ | *** ''Note added after the meeting: there may be some channels where we just want to look at timing, such as the timing between the event trigger and the GEM clock. So we might want a VETROC and some discriminators in the system even if we don't use them for the bulk of the channels.'' | ||
+ | ** The major issue for setting up the 90% review is getting the beamline instrumentation better defined. Bob and I will follow up in a few weeks to decide if we need to delay the 90% review from the penciled-in "June" time-frame |
Latest revision as of 21:06, 10 May 2022
Back to Main Page >> Data Acquisition Meetings >> Counting mode DAQ meetings
previous meeting << >> following meeting
Meeting information
Meeting time: 12:00pm Eastern Zoom connection information Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1603800887?pwd=aXVmSnN6aWZWN3RBdXB4RUhGckZJdz09 Meeting ID: 160 380 0887 Passcode: 903612 US Tool free phone: (833) 568 8864 Find your local number: https://jlab-org.zoomgov.com/u/ab8341cjcG
Agenda
- "Digital BCM readout: what was done and what could be done at JLab" -- Bob M.
https://userweb.jlab.org/~rom/digibcm/DigiMonStatus.pdf
- Activity updates
- Thoughts about getting ready for 90% review
- Need to draft & submit the change request to take the VETROC out of design
- HDMI cable length tests; decision on MPD position; radiation environment evaluation for MPDs
- Availability of Hanjie's SOLID test stand firmware as reference/example for VTP trigger definition?
- Available at https://github.com/hanjie1/solid_ecal
- Follow-up with grounding working group?
- Beam monitor requirements for counting mode and how to instrument?
- Electrical safety evaluation of components; Electrical Safety Committee member for review?
- General discussion
Minutes
Recording on Zoom: [1]
Participants: R. Michaels, C. Ghosh, D. Armstrong, P. King, C. Zorn, D. McNulty, B. Moffit
- Discussion of previous work on JLab digital beam monitors
- Chad and Randall had previously had a system to send digital data, a 24-bit word at 10ksps, from a BCM to a V1495. The V1495 accumulated these data words to produce the charge integral over a CODA run
- Bob and I will follow up with John and Chad Seaton about the path to develop a system that would meet our needs.
- Activity updates
- Paul has restored the server for his test stand at OU (after a major server crash)
- Bob now has a VTP in his TEDF test stand, but hasn't started working with it yet.
- We have Hanjie's github repo with the SOLID VTP test stand firmware, and Bob is also following the development of the HCAL VTP firmware
- David hasn't received the HDMI cables for the length study yet
- David is working to get xray fluxes at the GEMs, to be able to see if that will cause significant changes in our rates. He may have a result in a few weeks
- Discussion of what to do for 90% review
- We haven't put in the change request to take the VETROC out of our design.
- David suggests bringing Mark P. into the discussion about removing the VETROC to see if some of the diagnostic channels need the better timing.
- In our previous plan, we had specified the JLab discriminator/scaler modules that were clocked at 125MHz, so to benefit from the better time resolution we'd need to specify different discriminators
- Note added after the meeting: there may be some channels where we just want to look at timing, such as the timing between the event trigger and the GEM clock. So we might want a VETROC and some discriminators in the system even if we don't use them for the bulk of the channels.
- The major issue for setting up the 90% review is getting the beamline instrumentation better defined. Bob and I will follow up in a few weeks to decide if we need to delay the 90% review from the penciled-in "June" time-frame
- We haven't put in the change request to take the VETROC out of our design.