Difference between revisions of "IntegrationDaq 220211"
From Moller Wiki
(→Minutes) |
(→Minutes) |
||
Line 28: | Line 28: | ||
== Minutes == | == Minutes == | ||
Recording at zoomgov: [https://jlab-org.zoomgov.com/rec/share/CZ_UGy6P_XBp6vP6DKwIKaLIVPgKiburxT_MEa8spBtfHMKKa1iP5XjDOCHrmB2P.iNqQ2NPlOSXDQvLQ | Recording at zoomgov: [https://jlab-org.zoomgov.com/rec/share/CZ_UGy6P_XBp6vP6DKwIKaLIVPgKiburxT_MEa8spBtfHMKKa1iP5XjDOCHrmB2P.iNqQ2NPlOSXDQvLQ | ||
− | ] | + | Meeting recording] |
Participants: R. Michaels, B. Moffit, D. Bishop, B. Blaikie, W. Gu, P. King, M. Gericke | Participants: R. Michaels, B. Moffit, D. Bishop, B. Blaikie, W. Gu, P. King, M. Gericke |
Revision as of 23:21, 22 February 2022
Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings
previous meeting << >> following meeting
Meeting information
Meeting time: 12:00pm Eastern Zoom connection information Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1603800887?pwd=aXVmSnN6aWZWN3RBdXB4RUhGckZJdz09 Meeting ID: 160 380 0887 Passcode: 903612 US Tool free phone: (833) 568 8864 Find your local number: https://jlab-org.zoomgov.com/u/ab8341cjcG
Agenda
- Activity updates
- We have restarted the discussion of the integrator running modes we would like to have available, but is not final
- General discussion
Open Issues to be followed up later
- Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
- Draft timing diagram: DocDB 790
- Michael, Bob, Brynne, and Paul should put together a list of the integrator running modes we would like to have available
Minutes
Recording at zoomgov: [https://jlab-org.zoomgov.com/rec/share/CZ_UGy6P_XBp6vP6DKwIKaLIVPgKiburxT_MEa8spBtfHMKKa1iP5XjDOCHrmB2P.iNqQ2NPlOSXDQvLQ
Meeting recording]
Participants: R. Michaels, B. Moffit, D. Bishop, B. Blaikie, W. Gu, P. King, M. Gericke
- Talking about the concept of the integrating ADC firmware DocDB 864
- The delay between the trigger to the "Start of integration" will be done in the TI firmware within the module.
- We can use either the leading edge or trailing edge of the Tsettle as the trigger to give us the most flexibility in defining the time
- In an email after the meeting, Michael asks if we might need to have different delays for different channels, such as for beam monitors at different places along the beam line running into the same ADC board
- Daryl points out that the ADC samples will be running all the time, and the trigger information is just flagging what to do with the samples, such as to integrate them or to store them as the waveform, etc.
- Bryan asks if we could have some "lookback" or latency in the module such that we could actually accumulate samples from earlier than the trigger arrives
- Talking about the subblocks
- Our normal subblocks would be the time-ordered blocks, i.e. the first subblock is the first quarter of the helicity window, etc.
- The interleaved subblock proposal would have every fourth sample accumulated in the same block, i.e. the first interleaved subblock would be samples 1, 5, 9, etc.
- Bryan asks if the interleaved blocks are designed to look for a particular type of noise, or if there might be some better choice to pick out a type of noise; the answer is that these aren't specifically designed for a particular type of noise. This had been brought up at a collaboration meeting several years ago, and we don't recall right now if this was targeted at something specific
- The delay between the trigger to the "Start of integration" will be done in the TI firmware within the module.