Difference between revisions of "IntegrationDaq 211201"
From Moller Wiki
(Created page with "__NOTOC__ Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings In...") |
|||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
Back to [[Main_Page|Main Page]] >> [[DAQ Meetings|Data Acquisition Meetings]] >> [[DAQ Meetings#Integrating mode DAQ meetings|Integrating mode DAQ meetings]] | Back to [[Main_Page|Main Page]] >> [[DAQ Meetings|Data Acquisition Meetings]] >> [[DAQ Meetings#Integrating mode DAQ meetings|Integrating mode DAQ meetings]] | ||
− | [[IntegrationDaq_211117 | previous meeting]] << >> [[ | + | [[IntegrationDaq_211117 | previous meeting]] << >> [[IntegrationDaq_220128 | following meeting]] |
== Meeting information == | == Meeting information == | ||
Line 22: | Line 22: | ||
# Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting | # Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting | ||
# Draft timing diagram: [https://moller.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=790 DocDB 790] | # Draft timing diagram: [https://moller.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=790 DocDB 790] | ||
+ | # Michael, Bob, Brynne, and Paul should put together a list of the integrator running modes we would like to have available | ||
== Minutes == | == Minutes == | ||
− | + | Participants: P. King, C. Cuevas, W. Gu, M. Gericke, J. Pan, R. Michaels, B. Blaikie, J. Fast | |
− | + | * Update on the integrator. Both Daryl and Bryerton are out on vacation through the end of the year. Daryl sent the following set of updates: | |
+ | ** The problem with the XU1 being fried was related to a power-up sequencing error. This was fixed by removing a part that is not essential to the module operation | ||
+ | ** The two modules at TRIUMF have been modified to correct other minor problems | ||
+ | ** Both ADC boards have been powered up through the POE and external power connections successfully | ||
+ | ** Both ADC boards are booting correctly and are ready for firmware development | ||
+ | ** Not sure if Michael wants to do their own modifications or send them to TRIUMF | ||
+ | ** It's unlikely that Bryerton will make any significant progress on the firmware until next year | ||
+ | * Other discussion | ||
+ | ** Michael will probably send the other three boards to TRIUMF for the modifications | ||
+ | ** Discussion of the test stand development | ||
+ | *** I have two crates set up at OU and am waiting for the CPUs (expected ~15 DEC). I have a scaler module and digital gate generator to begin with. | ||
+ | *** Bob talks about the JLab test stand where we have the FADC and VETROC for event mode testing; this will also be shared for Compton DAQ testing | ||
+ | ** I need to get the list of anticipated module counts to Chris; we should then see if we can start to order components, etc. |
Latest revision as of 19:41, 26 January 2022
Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings
previous meeting << >> following meeting
Meeting information
Meeting time: 3:00pm Eastern BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 Other BlueJeans access phone numbers are listed at https://www.bluejeans.com/premium-numbers Bluejeans CODE: 385 600 867 Bluejeans link: https://bluejeans.com/385600867
Agenda
- Activity updates
- Status of 16-ch. integrator firmware development
- General discussion
Open Issues to be followed up later
- Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
- Draft timing diagram: DocDB 790
- Michael, Bob, Brynne, and Paul should put together a list of the integrator running modes we would like to have available
Minutes
Participants: P. King, C. Cuevas, W. Gu, M. Gericke, J. Pan, R. Michaels, B. Blaikie, J. Fast
- Update on the integrator. Both Daryl and Bryerton are out on vacation through the end of the year. Daryl sent the following set of updates:
- The problem with the XU1 being fried was related to a power-up sequencing error. This was fixed by removing a part that is not essential to the module operation
- The two modules at TRIUMF have been modified to correct other minor problems
- Both ADC boards have been powered up through the POE and external power connections successfully
- Both ADC boards are booting correctly and are ready for firmware development
- Not sure if Michael wants to do their own modifications or send them to TRIUMF
- It's unlikely that Bryerton will make any significant progress on the firmware until next year
- Other discussion
- Michael will probably send the other three boards to TRIUMF for the modifications
- Discussion of the test stand development
- I have two crates set up at OU and am waiting for the CPUs (expected ~15 DEC). I have a scaler module and digital gate generator to begin with.
- Bob talks about the JLab test stand where we have the FADC and VETROC for event mode testing; this will also be shared for Compton DAQ testing
- I need to get the list of anticipated module counts to Chris; we should then see if we can start to order components, etc.