IntegrationDaq 211201
From Moller Wiki
Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings
previous meeting << >> following meeting
Meeting information
Meeting time: 3:00pm Eastern BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 Other BlueJeans access phone numbers are listed at https://www.bluejeans.com/premium-numbers Bluejeans CODE: 385 600 867 Bluejeans link: https://bluejeans.com/385600867
Agenda
- Activity updates
- Status of 16-ch. integrator firmware development
- General discussion
Open Issues to be followed up later
- Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
- Draft timing diagram: DocDB 790
- Michael, Bob, Brynne, and Paul should put together a list of the integrator running modes we would like to have available
Minutes
Participants: P. King, C. Cuevas, W. Gu, M. Gericke, J. Pan, R. Michaels, B. Blaikie, J. Fast
- Update on the integrator. Both Daryl and Bryerton are out on vacation through the end of the year. Daryl sent the following set of updates:
- The problem with the XU1 being fried was related to a power-up sequencing error. This was fixed by removing a part that is not essential to the module operation
- The two modules at TRIUMF have been modified to correct other minor problems
- Both ADC boards have been powered up through the POE and external power connections successfully
- Both ADC boards are booting correctly and are ready for firmware development
- Not sure if Michael wants to do their own modifications or send them to TRIUMF
- It's unlikely that Bryerton will make any significant progress on the firmware until next year
- Other discussion
- Michael will probably send the other three boards to TRIUMF for the modifications
- Discussion of the test stand development
- I have two crates set up at OU and am waiting for the CPUs (expected ~15 DEC). I have a scaler module and digital gate generator to begin with.
- Bob talks about the JLab test stand where we have the FADC and VETROC for event mode testing; this will also be shared for Compton DAQ testing
- I need to get the list of anticipated module counts to Chris; we should then see if we can start to order components, etc.