Difference between revisions of "IntegrationDaq 210813"

From Moller Wiki
Jump to: navigation, search
(Created page with "__NOTOC__ Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings In...")
 
(Agenda)
Line 15: Line 15:
  
 
== Agenda ==
 
== Agenda ==
 +
*  Activity updates
 
*  General discussion
 
*  General discussion
 +
**  Should we keep the same meeting time through the Fall?
  
 
=== Open Issues to be followed up later ===
 
=== Open Issues to be followed up later ===
Line 22: Line 24:
 
## ICD -- interface control document(s). -- apparently Robin Wines made a template and it's on sharepoint.  It seems we need several of these (infrastructure to DAQ; detectors to DAQ, etc).
 
## ICD -- interface control document(s). -- apparently Robin Wines made a template and it's on sharepoint.  It seems we need several of these (infrastructure to DAQ; detectors to DAQ, etc).
 
# Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
 
# Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
 
  
 
== Minutes ==
 
== Minutes ==

Revision as of 14:32, 12 August 2021

Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings

previous meeting << >> following meeting

Meeting information

 Meeting time:  3:30pm Eastern
 
 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 Other BlueJeans access phone numbers are listed at https://www.bluejeans.com/premium-numbers
 
 Bluejeans CODE:                    641 252 323
 Bluejeans link: https://bluejeans.com/641252323

Agenda

  • Activity updates
  • General discussion
    • Should we keep the same meeting time through the Fall?

Open Issues to be followed up later

  1. Need two things by end of August (no hard deadline). Some of this is just cut/paste from existing docs.
    1. Design requirements document -- examples and template : http://userweb.jlab.org/~rom/mollerdaq/design
    2. ICD -- interface control document(s). -- apparently Robin Wines made a template and it's on sharepoint. It seems we need several of these (infrastructure to DAQ; detectors to DAQ, etc).
  2. Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting

Minutes

Recording on Bluejeans.com:

Participants: