Difference between revisions of "Pion Meeting June 4 2021 11AM ET"

From Moller Wiki
Jump to: navigation, search
(Created page with "Back to Main Page >> Pion Meetings * Bluejeans link: [https://bluejeans.com/420107252 420 107 252] * Dial-in: [tel:408-740-7256p420107252# 4...")
 
(Agenda)
 
(7 intermediate revisions by the same user not shown)
Line 6: Line 6:
 
=Agenda=
 
=Agenda=
  
# Updates on pion detector studies (Elham)
+
# Updates on pion detector studies (Elham) [https://moller.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=735]
 
# Beam generator simulations (Raj)
 
# Beam generator simulations (Raj)
  
 
=Attendance=
 
=Attendance=
 +
 +
David, Elham, Julia, Raj, Wouter
  
 
=Minutes=
 
=Minutes=
 +
 +
* Pion detector studies (Elham)
 +
** Entire pion donut holding frame changed to vacuum
 +
*** improves pi/e ratio by factor 2
 +
*** still have charged particles reach lucite
 +
*** frame is significant source of background
 +
** Shorter lucite detector and shifted inwards:
 +
*** improves pi/e ratio marginally but not dramatically
 +
** TODO
 +
*** Set the lucite lightguide to vacuum: check whether lightguide or PMT is a big part of the source of background in our lucite
 +
*** Look at hit.phi - hit.vphi (= atan2(hit.vx,hit.vy)): does background come from same or different sector?
 +
*** Draw separate sources independently and zoomed in: one plot each for showermax, concrete/lead, lightguide, lucite close-up with shielding, with number of entries shown on each plot
 +
*** Draw direction histogram for lucite hits at top surface: 1d histo of momentum theta, 2d histo of momentum theta and phi, 1d histo of dot product with axis towards PMT
 +
*** Check pi/e ratio at the main detector plane 28, probably only needs 100k events
 +
*** Copy files from /home/elhamm/projects/rrg-jmammei/elhamm/PionDetectorOptimization/simulation/scratch/16-16-AllFrame-Galactic-2cmshiftedLucite-7cm/moller.root to volatile

Latest revision as of 16:17, 4 June 2021

Back to Main Page >> Pion Meetings

Agenda

  1. Updates on pion detector studies (Elham) [1]
  2. Beam generator simulations (Raj)

Attendance

David, Elham, Julia, Raj, Wouter

Minutes

  • Pion detector studies (Elham)
    • Entire pion donut holding frame changed to vacuum
      • improves pi/e ratio by factor 2
      • still have charged particles reach lucite
      • frame is significant source of background
    • Shorter lucite detector and shifted inwards:
      • improves pi/e ratio marginally but not dramatically
    • TODO
      • Set the lucite lightguide to vacuum: check whether lightguide or PMT is a big part of the source of background in our lucite
      • Look at hit.phi - hit.vphi (= atan2(hit.vx,hit.vy)): does background come from same or different sector?
      • Draw separate sources independently and zoomed in: one plot each for showermax, concrete/lead, lightguide, lucite close-up with shielding, with number of entries shown on each plot
      • Draw direction histogram for lucite hits at top surface: 1d histo of momentum theta, 2d histo of momentum theta and phi, 1d histo of dot product with axis towards PMT
      • Check pi/e ratio at the main detector plane 28, probably only needs 100k events
      • Copy files from /home/elhamm/projects/rrg-jmammei/elhamm/PionDetectorOptimization/simulation/scratch/16-16-AllFrame-Galactic-2cmshiftedLucite-7cm/moller.root to volatile