== Milestones ==  
 
== Milestones ==  
 
# [[hybrid/segmented downselect]] - November 15
 
# [[hybrid/segmented downselect]] - November 15
## November 20, December 4th meeting
+
 
## Change control board meeting mid-December
+
## prioritize recent blocky models for this
+
### Will new SC4 work cooling water tubes extra 4mm?
+
## remove hump, tail angle - probably not needed right now
+
## Checks for
+
### full distributions (1D and 2D)
+
### optimization of tiles - deconvolution (is this necessary)
+
#### use the current optimization of the tiles and run deconvolution code
+
### checking envelopes (probably not necessary for downselect)
+
  
 
# Collimators  (mid- December)
 
# Collimators  (mid- December)

Revision as of 17:10, 2 November 2020

MOLLER Main

Teleconference Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  734 609 7559
 Bluejeans link: https://bluejeans.com/7346097559
text
The MOLLER spectrometer in TOSCA
text
Layout of the hybrid torus conductor

Milestones

  1. hybrid/segmented downselect - November 15


  1. Collimators (mid- December)
    1. collimator 1, 2 merge
    2. hot spots on upstream
      1. W plate
      2. optimize the 2-bounce shield (Chandan, Naz)
    3. collimator 4 (resculpting)
    4. collimator 5 (including "septapus" for shielding)
  1. Review irradiation papers by mid-December
    1. Cip, KK, Kent, Juliette
    2. Can we live with higher doses on the epoxy than we have been assuming?
    3. Do we trust the results?
    4. Are the energies/species close enough?
  1. beam pipes and enclosures - are major changes required? - Start mid-December
    1. upstream enclosure and pipes (mid-December)
    2. clean beam transport due to the SAMs intrusions into the pipe
      1. Cip has a student designing the SAM intrusions
    3. aperture in the dump tunnel
  1. Supports at low radius
    1. inter-coil supports "under" the envelopes
    2. now 2-bounce shield is load bearing?
    3. DS torus "2-bounce" not needed, but septapus for shielding
  1. Specifications document
    1. KK and Juliette will look at red text
    2. We should meet to discuss these