Agenda

  • Status of He vs Vac decision
    • Chandan has 2-bounce code
    • Sakib has completed simulation results
    • Cameron - envelopes

Minutes

  • Status of He vs Vac decision
    • Chandan has 2-bounce code
      • no real surprises
      • two tweaks beyond Dave's excel spreadsheet
        • add beampipe for add'l 7.5 cm
        • pipe between collimator 1 and 2
    • Sakib has completed simulation results
      • FOM doesn't change with the various
    • Cameron - envelopes
      • envelop is finished up to collimator 4 and 5
      • still working on the lintels and the rings
      • will convert a CAD of the envelopes by Aug 10
  • Collimator 1 merge with collimator 2?
    • mostly an engineerign choice
    • we will be looking at this when doing the beamline power sims
  • Pugh matrix for segmented vs. hybrid coil design being developed


Attendance: Chandan, Sandesh, Randy, Probir, Ruben, Cameron, KK, Juliette, Sakib