Wednesday, August 7, 2019 2:30pm ET
From Moller Wiki
previous meeting << >> following meeting
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 734 609 7559 Bluejeans link: https://bluejeans.com/7346097559
Agenda
- Status of He vs Vac decision
- Chandan has 2-bounce code
- Sakib has completed simulation results
- Cameron - envelopes
Minutes
- Status of He vs Vac decision
- Chandan has 2-bounce code
- no real surprises
- two tweaks beyond Dave's excel spreadsheet
- add beampipe for add'l 7.5 cm
- pipe between collimator 1 and 2
- Sakib has completed simulation results
- FOM doesn't change with the various
- Cameron - envelopes
- envelop is finished up to collimator 4 and 5
- still working on the lintels and the rings
- will convert a CAD of the envelopes by Aug 10
- Chandan has 2-bounce code
- Collimator 1 merge with collimator 2?
- mostly an engineerign choice
- we will be looking at this when doing the beamline power sims
- Pugh matrix for segmented vs. hybrid coil design being developed
Attendance: Chandan, Sandesh, Randy, Probir, Ruben, Cameron, KK, Juliette, Sakib