Tuesday, July 17, 2018 10:00am ET

From Moller Wiki
Jump to: navigation, search

previous meeting << >> following meeting

Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                    734 609 7559
 Bluejeans link: https://bluejeans.com/7346097559

Agenda

  1. Segmented hybrid preliminary results pdf
  2. Prototype coil
    1. water pressure test results
    2. test plan
  3. Sensitivities update
  4. Collimator simulations update

Minutes

Attendance: Jim, Ernie, Jason, Juliette, KK, Cameron

  1. Segmented hybrid preliminary results
    1. need physics sim in GEANT4
    2. need careful water-cooling calculations
  2. Meeting with Ruben
    1. learning about the project
    2. David Cashy
    3. Sandesh
    4. Spectrometer "CDR"
  3. Water cooling calcs
    1. power supply picked up this week
    2. wired and try to power
    3. water available
    4. test plan
      1. July 23 - PS arrives
      2. hook up water/ power
      3. test water pressure/flow rates
      4. measure temperature along coils (thermal imaging)
      5. power each coil set separately
      6. measure distortions (indicators)
      7. wasn't vacuum impregnated - can't look for epoxy integrity
      8. benchmarking the water-cooling calcs
  4. Sensitivities update
  5. Collimator simulations update
  6. Next meetings
    1. July 31 - move to August 3 - revisit hybrid coil
    2. August 9 - Bluejeans meeting for task tracking
    3. Ruben join bi-weekly meetings