Thursday, August 18, 2022 2pm ET
From Moller Wiki
previous meeting << >> following meeting
Zoom calling instructions: Zoom link: https://jlab-org.zoomgov.com/j/1610336969?pwd=T0hOMzRUbUVvMGlFTEZkMXBxYlZIZz09
Agenda - Upstream
- SRD - final draft sent to Mike; was supposed to go out for signature
- TDR
- broad outline finalized
- authors/editors confirmed (except Eric)
- grabbing figures from PDRs - pdf
- Status of various questions - pdf
- Cip send collar 0 dims to Dave
- Sakib check coll 5 z location in is has US faces at 7558 and 7671 mm
- coll 6 a,b
- resolve discrepancy between spreadsheet and CAD
- Chandan will cross-check 6a, b AND 5 at new locations
- SAM pipe
- confirm locations of flanges
- add ring for SAM stubby tube flanges?
- check detector plane backsplash
- Other
- should pitch at least subcoil 3
- need to check clearances for underbelly plates - what is included in coil inner radius
- thickness of underbelly plates - can they have gaps (yes, will check with med priority)
- Meetings needing
- coil mods from winding
- field mapping procedure
- should pitch at least subcoil 3
- Need to find a new meeting time for the fall
Minutes
Attendance:
- Upstream
- water flow on upstream modelled
- PNID next week
- upstream failure mode analysis
- subcoil 3 prototype coming to JLAB
- SRD - final draft sent to Mike; was supposed to go out for signature
- TDR
- broad outline finalized
- authors/editors confirmed (except Eric)
- grabbing figures from PDRs - pdf
- Status of various questions - pdf
- Cip send collar 0 dims to Dave
- Sakib check coll 5 z location in sim has US faces at 7558 and 7671 mm
- coll 6 a,b
- resolve discrepancy between spreadsheet and CAD
- Chandan will cross-check 6a, b AND 5 at new locations
- SAM pipe
- confirm locations of flanges
- add ring for SAM stubby tube flanges?
- check neckdown dimensions
- bellows is inconel
- 2-bounce - 175 mm is the radius at which you will begin to see the end of collimator 1
- check detector plane backsplash
- Other
- should pitch at least subcoil 3 (possibly subcoil 2) <-- ??
- need to check clearances for underbelly plates - what is included in coil inner radius
- if we pitch it - then collimator 5 can be moved relative to the coil so it stays in the same physical location
- thickness of underbelly plates - can they have gaps (yes, will check with med priority)
- Meetings needing
- coil mods from winding
- field mapping procedure
- should pitch at least subcoil 3 (possibly subcoil 2) <-- ??
- Need to find a new meeting time for the fall
Return to Spectrometer Meetings