Simulation Meeting August 26 2021 2PM ET
From Moller Wiki
Back to Main Page >> Simulation Meetings
previous meeting << >> following meeting
Contents
[hide]Agenda
- Collimator 6 and lintels update - Chandan docDB787
Attendance
Minutes
- Goal of Col-6 is to stop col-4 induced charge particles coming thru bore going into acceptance due to the magnetic fringe dipole field ## Due to support structure req. Col-6 will be split into two parts and installed at 2nd and 3rd bulkhead
- The two collimators design and installed within the tolerances
- Lintel optimization update
- We may have to optimize the thickness of the lintels to reduce the weight from mounting pointing of view maybe good to plot energy weighted envelops to determine lintel thickness
- The weight will cause bulkheads and hence the coils to bend if lintels got too heavy
bluejeans information
Meeting ID 635010453
Meeting URL
https://bluejeans.com/635010453
Here are more details about the meeting connection:
Connecting directly from a room system? 1) Dial: 199.48.152.152 or bjn.vc 2) Enter Meeting ID: 635 010 453
Just want to dial in on your phone? 1) +1.408.740.7256 (US)
+1.888.240.2560 (US Toll Free) +1.408.317.9253 (Alternate number)
2) Enter Meeting ID: 635 010 453 3) Press #
Return to Simulation Meetings
Return to Simulations Main Page
Return to Main Page