Meeting information

 Meeting time:  11:00am Eastern
 Location at JLab:  CC F226
 
 Zoom connection information is sent out by email; please reach out to Paul if you don't have the current link.

Agenda

  • Activity updates
  • General discussion

Minutes

Recording at zoomgov:

Participants: S. Malace, R. Michaels, P. King, B. Moffit, R. Fair, M. Gericke, A. Sen, B. Blaikie, S. Regmi, S. Chatterjee, D. McNulty, Z. Ji, H. Liu, P. Souder

  • Michael
    • All of the ADC boards are at Manitoba. Four have been tested so far, going though all the channels. Two of those will be sent to W&M and then Bryan can pick them up to start working with the rev2 boards at JLab.
    • Estimated two weeks to test all of the boards
  • Michael has been requested by Daryl to summarize the firmware requirements
    • He has sent it to me for comment
    • There is a handoff meeting with Daryl, Chris (Pearsen), Bryerton, Michael this week
    • We discuss the firmware document
      • Bryan was confused as to how the integration would be handled, if we need multiple start signals from
      • Michael says that the integration module is in the firmware, but would need a wrapper to actually call it based on the TI start signal
  • Bryan
    • Has the CODA3 streaming mode that can be analyzed by Michael's streaming analyzer
    • The DMA witht eh TI data is now working properly; he had a
    • He is putting together a distribution for the OS
      • Supports the ZMQ server
      • Has the CODA ROC
      • Right now he is booting diskless with PXE, but will also prepare it for installation on the SD card
      • Hopeful to have it ready by the time the rev2 boards arrive, but want to also make it available to Dustin soon; Bryan is on vacation this week