IntegrationDaq 250403
From Moller Wiki
Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings
previous meeting << >> following meeting
Meeting information
Meeting time: 11:00am Eastern Location at JLab: CC F226 Zoom connection information is sent out by email; please reach out to Paul if you don't have the current link.
Agenda
- Activity updates
- General discussion
Minutes
Recording at zoomgov:
Participants: S. Malace, R. Michaels, P. King, B. Moffit, R. Fair, M. Gericke, A. Sen, B. Blaikie, S. Regmi, S. Chatterjee, D. McNulty, Z. Ji, H. Liu, P. Souder
- Michael
- All of the ADC boards are at Manitoba. Four have been tested so far, going though all the channels. Two of those will be sent to W&M and then Bryan can pick them up to start working with the rev2 boards at JLab.
- Estimated two weeks to test all of the boards
- Michael has been requested by Daryl to summarize the firmware requirements
- He has sent it to me for comment
- There is a handoff meeting with Daryl, Chris (Pearsen), Bryerton, Michael this week
- We discuss the firmware document
- Bryan was confused as to how the integration would be handled, if we need multiple start signals from
- Michael says that the integration module is in the firmware, but would need a wrapper to actually call it based on the TI start signal
- Bryan
- Has the CODA3 streaming mode that can be analyzed by Michael's streaming analyzer
- The DMA witht eh TI data is now working properly; he had a
- He is putting together a distribution for the OS
- Supports the ZMQ server
- Has the CODA ROC
- Right now he is booting diskless with PXE, but will also prepare it for installation on the SD card
- Hopeful to have it ready by the time the rev2 boards arrive, but want to also make it available to Dustin soon; Bryan is on vacation this week