CountingDaq 230929
From Moller Wiki
Back to Main Page >> Data Acquisition Meetings >> Counting mode DAQ meetings
previous meeting << >> following meeting
Meeting information
Meeting time: 1:00pm Eastern Zoom connection information is sent out by email; please reach out to Paul if you don't have the current link.
Agenda
- Activity updates
- General discussion
Minutes
Recording on Zoom: [1]
Participants: S. Malace, B. Moffit, K. Dehmelt, P. King, C. Ghosh, S. Chatterjee, D. Adhikari, D. Armstrong, R. Conaway, R. Michaels, S. Tarafdar, D. McNulty, M. Gericke
- Sayak had just returned from the Mainz beam test, so doesn't have an update on the work at UMass
- I will follow up with Nilanga on availability of MPD and APV for Stonybrook
- Simona is going to start work on the counting mode DAQ
- Ryan, Simona, and I should discuss the VTP firmware programming work
- Bob mentions that Hanjie is going to be involved in the DAQ systems for the two Moller polarimeters
- David mentions that the HDMI cables to the MPDs would be coming from above the racks, and the HVMAPS cables would be coming from below. So we should invert the rack layout I had presented last time, and post it to DocDB
- Bob says that we should get detailed rack layout for the SBS bunker also. I'll start with the DAQ module layout and then we'll need to reach out to the other groups for LV/HV/Slow Controls
- The folks at Stonybrook will be away at a testbeam in October, so we should plan on getting the CODA DAQ system components to them in November or so