Simulation Meeting September 29 2022 1130AM ET
From Moller Wiki
Back to Main Page >> Simulation Meetings
previous meeting << >> following meeting
Agenda
Attendance
Minutes
- Particle Flux at the Roof of the Hall
- Fluka and G4 config 26 are similar
- Radcon (Lorenzo) site boundary dose estimate shown in slide 2
- Config 28 has shown an increase in dose due to shielding wall and collar reorganization
- Config 34 has dose rates comparable to config 26 now but requires significant shielding upgrades. The difference between two is less than 1 mrem
- the designs 31/32/33/34 resolve many access constraints for engineers while keeping a manageable dose
- Robin will do a cost comparison for these different configurations.
- Updated US torus Shielding Design
- Changes to be compatible with engineering designs. Details is slides 9-11
- We have almost 100% at feedback to engineers on shielding
- KK suggested the idea of mounting additional detectors in the roof to verify some of the simulation observations. Ciprian will talk to Lorenzo about it and we may make a official request about it to radconn
ZoomGov Meeting Information
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1614247492?pwd=c3ExVDdOTlJRbnFJVUxNM2VQK0Y3dz09
Meeting ID: 161 424 7492
Passcode: 968534
One tap mobile +16692545252,,1614247492# US (San Jose) +16468287666,,1614247492# US (New York)
Dial by your location
+1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 551 285 1373 US +1 669 216 1590 US (San Jose) 833 568 8864 US Toll-free
Meeting ID: 161 424 7492 Find your local number: https://jlab-org.zoomgov.com/u/ad37EsPSza
Join by SIP 1614247492@sip.zoomgov.com
Join by H.323 161.199.138.10 (US West) 161.199.136.10 (US East) Meeting ID: 161 424 7492 Passcode: 968534
Return to Simulation Meetings
Return to Simulations Main Page
Return to Main Page