Agenda
- Discussion of Director's Review
- Prep for upcoming review
- General Updates
Minutes
Attendance:
- Discussion of Director's Review
- dipole corrector
- too late in the game to consider this
- Dave, Jim and Mike met with Soren - PS issues
- possible CD3a for power supply
- John Lucasabi? engineer - reviewer in DOE review
- dipole corrector
- Prep for upcoming Office of Project Assessment (OPA) review
- Charge needed
- November 2-4 (not 5th?)
- Agenda - keep all the talks the same
- Jim has detailed notes about how long each talk took
- backup slides should be self-contained, but keep backup and main talk the same
- only thing to do - 2 of the four subsystems into parallel session
- (detectors and DAQ)
- spectrometer and target remain plenary
- slides uploaded by 2 weeks minimum ahead of time
- notes slides in the pdf for regular meeting slides or write a technote
- General Updates
- collimator 1+2 1pm ET
- material for collimator 1 - CW95 (leaktight, able to be brazed?)
- power distribution (latest from Chandan - Nov. 4, 2020)
- lowest radius kept in same place and extended collimator 1 to collimator 2
- correct collimator in JT file and simulation (Sakib used Chandan's geometry)
- kickoff meeting with vendor for downstream coils 2pm ET
- alignment task force - 3pm ET (every week - next week is the 25th)
- collimator 6a, b - CW95 10cm vs 70mm
- updated CAD model for collimator 5 coming
- radiation hot spot is only remaining issue
- need the actual collimators
- also look at the downstream container and drift pipe
- Cip should get stp file from Dave - (Chandan and Rakitha should put it in)
- also has clamps and bulkheads - Chandan is working on clamps and collimators
- collimator 1+2 1pm ET