Monday, October 4, 2021 11am ET

From Moller Wiki
Revision as of 15:52, 4 October 2021 by Crowder (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

previous meeting << >> following meeting

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                    734 609 7559
 Bluejeans link: https://bluejeans.com/7346097559

Agenda

  • Discussion of Director's Review
  • Prep for upcoming review
  • General Updates


Minutes

Attendance:

  • Discussion of Director's Review
    • dipole corrector
      • too late in the game to consider this
    • Dave, Jim and Mike met with Soren - PS issues
      • possible CD3a for power supply
      • John Lucasabi? engineer - reviewer in DOE review
  • Prep for upcoming Office of Project Assessment (OPA) review
    • Charge needed
    • November 2-4 (not 5th?)
    • Agenda - keep all the talks the same
      • Jim has detailed notes about how long each talk took
      • backup slides should be self-contained, but keep backup and main talk the same
    • only thing to do - 2 of the four subsystems into parallel session
      • (detectors and DAQ)
    • spectrometer and target remain plenary
    • slides uploaded by 2 weeks minimum ahead of time
    • notes slides in the pdf for regular meeting slides or write a technote
  • General Updates
    • collimator 1+2 1pm ET
      • material for collimator 1 - CW95 (leaktight, able to be brazed?)
      • power distribution (latest from Chandan - Nov. 4, 2020)
      • lowest radius kept in same place and extended collimator 1 to collimator 2
      • correct collimator in JT file and simulation (Sakib used Chandan's geometry)
    • kickoff meeting with vendor for downstream coils 2pm ET
    • alignment task force - 3pm ET (every week - next week is the 25th)
    • collimator 6a, b - CW95 10cm vs 70mm
    • updated CAD model for collimator 5 coming
    • radiation hot spot is only remaining issue
      • need the actual collimators
      • also look at the downstream container and drift pipe
        • Cip should get stp file from Dave - (Chandan and Rakitha should put it in)
        • also has clamps and bulkheads - Chandan is working on clamps and collimators


Return to Spectrometer Meetings