IntegrationDaq 210716

From Moller Wiki
Revision as of 19:21, 16 July 2021 by Pking (Talk | contribs) (Agenda)

Jump to: navigation, search

Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings

previous meeting << >> following meeting

Meeting information

 Meeting time:  3:30pm Eastern
 
 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 Other BlueJeans access phone numbers are listed at https://www.bluejeans.com/premium-numbers
 
 Bluejeans CODE:                    641 252 323
 Bluejeans link: https://bluejeans.com/641252323

Agenda

  • Progress on prototype
  • Discussion on trigger/event timing
    • We plan to run MOLLER with a 10us "spin flip" period. The beam travel time from injector to the hall is ~20us, so a new helicity integration window starts in the injector while the old integration window in the hall is finishing.
      • How best to coordinate starting the integration and building events? We had discussed having the time shift done in the TI connection.
      • Should INJ and hall readout be coupled or independent (baseline design concept has them coupled)?
  • Signal cable and signal level adaptation
    • For the BPM signals (up to 5V, single-ended signals on coax), what I recall discussing was that we would have an option to short one side of the twin-ax cable, and could also use attenuation to get the signals within the range accepted by the ADC
    • We'd also need some sort of cable adaptation to go from the coax to the twinax
    • Should we think about doing this as some sort of panel to which we connect both cables, or should we think about doing it with a cable that has a twin-ax connector on one side and a BNC on the other?
  • Activity updates
  • General discussion

Minutes

Recording on Bluejeans.com:

Participants: