Difference between revisions of "CountingDaq 250410"
From Moller Wiki
(Created page with "__NOTOC__ Back to Main Page >> Data Acquisition Meetings >> Counting mode DAQ meetings Counting...") |
(→Minutes) |
||
Line 17: | Line 17: | ||
Recording on Zoom: | Recording on Zoom: | ||
− | Participants: | + | Participants: S. Malace, M. Gericke, D. Armstrong, S. Chatterjee, P. King, B. Blaikie, R. Conaway, Z. Ji, H. Liu, A. Sen, R. Fair, P. Souder |
+ | |||
+ | * Status of the W&M daq | ||
+ | ** The second FADC is throwing errors in analysis; Arindam is looking into this issue. | ||
+ | ** The DAQ has been running smoothly | ||
+ | ** Still need to talk with Ben to get the firmware for VTP built | ||
+ | * Status of the ESB DAQ | ||
+ | ** Simona needs a Linux CPU for the second crate; Hanjie may have one in the box from Bob, or could reach out to Alex to borrow one of SoLID's ones | ||
+ | *** Arindam says we may have one; he'll check | ||
+ | * Status of the test lab DAQ | ||
+ | ** Dustin, Simona, Hanjie, Arindam, Zhongling, and the techs will be rearranging the rack layout tomorrow to free up the space needed for the spectrometer work | ||
+ | ** David will later be bringing more equipment for the pion detector tests soon also | ||
+ | ** The test lab crates and server should be shut down this afternoon; Simona, Arindam, and Zhongling will meet at 1pm to do that | ||
+ | * Integrating ADCs | ||
+ | ** Michael expects to send two of the rev2 ADC modules to JLab next week | ||
+ | ** For the firmware development, Chris P. had asked to get the latest firmware that Bryan and William have with the TI support, but they are both on vacation this week. Michael will follow up next week with them |
Latest revision as of 15:21, 10 April 2025
Back to Main Page >> Data Acquisition Meetings >> Counting mode DAQ meetings
previous meeting << >> following meeting
Meeting information
Meeting time: 11:00am Eastern Location at JLab: CC F226 Zoom connection information is sent out by email; please reach out to Paul if you don't have the current link.
Agenda
- Activity updates
- General discussion
Minutes
Recording on Zoom:
Participants: S. Malace, M. Gericke, D. Armstrong, S. Chatterjee, P. King, B. Blaikie, R. Conaway, Z. Ji, H. Liu, A. Sen, R. Fair, P. Souder
- Status of the W&M daq
- The second FADC is throwing errors in analysis; Arindam is looking into this issue.
- The DAQ has been running smoothly
- Still need to talk with Ben to get the firmware for VTP built
- Status of the ESB DAQ
- Simona needs a Linux CPU for the second crate; Hanjie may have one in the box from Bob, or could reach out to Alex to borrow one of SoLID's ones
- Arindam says we may have one; he'll check
- Simona needs a Linux CPU for the second crate; Hanjie may have one in the box from Bob, or could reach out to Alex to borrow one of SoLID's ones
- Status of the test lab DAQ
- Dustin, Simona, Hanjie, Arindam, Zhongling, and the techs will be rearranging the rack layout tomorrow to free up the space needed for the spectrometer work
- David will later be bringing more equipment for the pion detector tests soon also
- The test lab crates and server should be shut down this afternoon; Simona, Arindam, and Zhongling will meet at 1pm to do that
- Integrating ADCs
- Michael expects to send two of the rev2 ADC modules to JLab next week
- For the firmware development, Chris P. had asked to get the latest firmware that Bryan and William have with the TI support, but they are both on vacation this week. Michael will follow up next week with them