Difference between revisions of "Simulation Meeting February 6 2024 10AM ET"

From Moller Wiki
Jump to: navigation, search
(Agenda for Today)
(Minutes)
 
Line 19: Line 19:
  
 
=Minutes=
 
=Minutes=
*
+
* Remoll dump lead shielding is used but it should be concrete
 +
** Fluka study show we require some additional concrete shielding to reduce dose in MD region
 +
** Ciprian is looking at the options for installing this proposed shielding

Latest revision as of 15:12, 6 February 2024

Back to Main Page >> Simulation Meetings

previous meeting << >> following meeting

Simulation page

Agenda for Today

  1. FLUKA Activation - shielding in dump: by Jhih-Ying Su docDB1193


Running Agenda

  1. Halo background study using beam generator
  2. Hyperon study
  3. Ferrous studies
  4. Berillium generator and vacuum window studies: almost finalized
  5. ep elastic background study to compare soft and hard scattering: Not yet started

Attendance

Minutes

  • Remoll dump lead shielding is used but it should be concrete
    • Fluka study show we require some additional concrete shielding to reduce dose in MD region
    • Ciprian is looking at the options for installing this proposed shielding