Difference between revisions of "IntegrationDaq 210716"

From Moller Wiki
Jump to: navigation, search
(Created page with "__NOTOC__ Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings In...")
 
(Agenda)
Line 16: Line 16:
 
== Agenda ==
 
== Agenda ==
 
*  Progress on prototype
 
*  Progress on prototype
*  Discussion on event timing
+
*  Discussion on trigger/event timing
**  We plan to run MOLLER with a 10us "spin flip" period.  The beam travel time from injector to the hall is ~20us, so a new helicity integration window starts in the injector while the old integration window in the hall is finishing.  How best to coordinate starting the integration and building events?  Should INJ and hall readout be coupled or independent (baseline design concept has them coupled)?
+
**  We plan to run MOLLER with a 10us "spin flip" period.  The beam travel time from injector to the hall is ~20us, so a new helicity integration window starts in the injector while the old integration window in the hall is finishing.
 +
*** How best to coordinate starting the integration and building events? We had discussed having the time shift done in the TI connection.
 +
*** Should INJ and hall readout be coupled or independent (baseline design concept has them coupled)?
 
*  Activity updates  
 
*  Activity updates  
 
*  General discussion
 
*  General discussion

Revision as of 21:00, 15 July 2021

Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings

previous meeting << >> following meeting

Meeting information

 Meeting time:  3:30pm Eastern
 
 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 Other BlueJeans access phone numbers are listed at https://www.bluejeans.com/premium-numbers
 
 Bluejeans CODE:                    641 252 323
 Bluejeans link: https://bluejeans.com/641252323

Agenda

  • Progress on prototype
  • Discussion on trigger/event timing
    • We plan to run MOLLER with a 10us "spin flip" period. The beam travel time from injector to the hall is ~20us, so a new helicity integration window starts in the injector while the old integration window in the hall is finishing.
      • How best to coordinate starting the integration and building events? We had discussed having the time shift done in the TI connection.
      • Should INJ and hall readout be coupled or independent (baseline design concept has them coupled)?
  • Activity updates
  • General discussion

Minutes

Recording on Bluejeans.com:

Participants: