Difference between revisions of "Simulation Meeting July 15 2021 2PM ET"
From Moller Wiki
(→Minutes) |
|||
Line 2: | Line 2: | ||
Back to [[Main_Page|Main Page]] >> [[Simulation_Meetings | Simulation Meetings]] | Back to [[Main_Page|Main Page]] >> [[Simulation_Meetings | Simulation Meetings]] | ||
− | [[Simulation_Meeting_July_8_2021_2PM_ET | previous meeting]] << >> [[ | + | [[Simulation_Meeting_July_8_2021_2PM_ET | previous meeting]] << >> [[Simulation_Meeting_July_22_2021_2PM_ET | following meeting]] |
[[Simulations | Simulation page ]] | [[Simulations | Simulation page ]] |
Revision as of 15:07, 21 July 2021
Back to Main Page >> Simulation Meetings
previous meeting << >> following meeting
Contents
[hide]Agenda
- Collar2 Region Shielding Update: [1]
Attendance
Minutes
- Collar2 Region Shielding Update by Zuhal
- Shielding configuration comparison for DS coil area with barrite wall or concrete wall before the DS collar area
- Col-5 studies paused for now and Chandan will produce envelopes all the way to the end of the hall. Chandan will have results by end of this month.
- We need to do a generator cross-check for ep and Moller with beam generator for very forward (below detector radius) and very large angles (above the ring radii)
bluejeans information
Meeting ID 635010453
Meeting URL
https://bluejeans.com/635010453
Here are more details about the meeting connection:
Connecting directly from a room system? 1) Dial: 199.48.152.152 or bjn.vc 2) Enter Meeting ID: 635 010 453
Just want to dial in on your phone? 1) +1.408.740.7256 (US)
+1.888.240.2560 (US Toll Free) +1.408.317.9253 (Alternate number)
2) Enter Meeting ID: 635 010 453 3) Press #
Return to Simulation Meetings
Return to Simulations Main Page
Return to Main Page