Difference between revisions of "Simulation Meeting September 8 2022 1130AM ET"

From Moller Wiki
Jump to: navigation, search
(Minutes)
 
(3 intermediate revisions by 2 users not shown)
Line 8: Line 8:
  
 
=Agenda=
 
=Agenda=
#  
+
# TID Calculations for the GEM racks [https://moller.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=973 docDB973]
 +
# TID calculations for the Thermistors in the DS Torus [https://moller.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=979 docDB979]
 +
# Collimator 6 design - Chandan [https://moller.jlab.org/DocDB/0009/000974/003/NewCollimatorDesign.pdf docDB974]
  
 
=Attendance=
 
=Attendance=
  
 
=Minutes=
 
=Minutes=
*  
+
*TID Calculations for the GEM racks
 
+
** DS barite wall is extended to cover the GEM racks
 +
** Compared placing the GEM racks before and after the wall (config 28 and 29)
 +
** Added Al shielding for GEM racks reduced the TID is less
 +
*TID calculations for the Thermistors in the DS Torus
 +
** Using config 29
 +
** Dose numbers for potential Thermistors locations shown
 +
*Collimator 6 design - Chandan docDB974
 +
** Effect of collimator 6 using symmetric maps
 +
** Compared with no col-6 A or B
 +
** Then added back col-A and B
 +
** The same study was done using realistic maps ( some asymmetry)
 +
** It seems like adding Col-6 B increases the background rate coming from the bore of Col-4
 +
** Col6-B needs to be tweaked, it could be that some mismatch with the engineering design, this issue was fixed and the study was done with correct Col6-B
 +
** The issue still exists, probably edge scattering in Col6-B
  
 
=ZoomGov Meeting Information=
 
=ZoomGov Meeting Information=

Latest revision as of 15:58, 8 September 2022

Back to Main Page >> Simulation Meetings

previous meeting << >> following meeting

Simulation page


Agenda

  1. TID Calculations for the GEM racks docDB973
  2. TID calculations for the Thermistors in the DS Torus docDB979
  3. Collimator 6 design - Chandan docDB974

Attendance

Minutes

  • TID Calculations for the GEM racks
    • DS barite wall is extended to cover the GEM racks
    • Compared placing the GEM racks before and after the wall (config 28 and 29)
    • Added Al shielding for GEM racks reduced the TID is less
  • TID calculations for the Thermistors in the DS Torus
    • Using config 29
    • Dose numbers for potential Thermistors locations shown
  • Collimator 6 design - Chandan docDB974
    • Effect of collimator 6 using symmetric maps
    • Compared with no col-6 A or B
    • Then added back col-A and B
    • The same study was done using realistic maps ( some asymmetry)
    • It seems like adding Col-6 B increases the background rate coming from the bore of Col-4
    • Col6-B needs to be tweaked, it could be that some mismatch with the engineering design, this issue was fixed and the study was done with correct Col6-B
    • The issue still exists, probably edge scattering in Col6-B

ZoomGov Meeting Information

Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1614247492?pwd=c3ExVDdOTlJRbnFJVUxNM2VQK0Y3dz09

Meeting ID: 161 424 7492

Passcode: 968534

One tap mobile +16692545252,,1614247492# US (San Jose) +16468287666,,1614247492# US (New York)

Dial by your location

       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 551 285 1373 US
       +1 669 216 1590 US (San Jose)
       833 568 8864 US Toll-free

Meeting ID: 161 424 7492 Find your local number: https://jlab-org.zoomgov.com/u/ad37EsPSza

Join by SIP 1614247492@sip.zoomgov.com

Join by H.323 161.199.138.10 (US West) 161.199.136.10 (US East) Meeting ID: 161 424 7492 Passcode: 968534





Return to Simulation Meetings
Return to Simulations Main Page
Return to Main Page