Difference between revisions of "Simulation Meeting May 23 2022 10AM ET"
From Moller Wiki
(→Agenda) |
|||
(2 intermediate revisions by 2 users not shown) | |||
Line 2: | Line 2: | ||
Back to [[Main_Page|Main Page]] >> [[Simulation_Meetings | Simulation Meetings]] | Back to [[Main_Page|Main Page]] >> [[Simulation_Meetings | Simulation Meetings]] | ||
− | [[Simulation_Meeting_May_16_2022_10AM_ET | previous meeting]] << >> [[ | + | [[Simulation_Meeting_May_16_2022_10AM_ET | previous meeting]] << >> [[Simulation_Meeting_June_6_2022_10AM_ET | following meeting]] |
[[Simulations | Simulation page ]] | [[Simulations | Simulation page ]] | ||
Line 9: | Line 9: | ||
=Agenda= | =Agenda= | ||
# Neutron Flux in US Coils [https://moller.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=898 docDB898] | # Neutron Flux in US Coils [https://moller.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=898 docDB898] | ||
+ | # Particle Flux on US Scanner Motors [https://moller.jlab.org/DocDB/0008/000899/001/ScannerDet_motor_flux_23May2022.pdf docDB899] | ||
=Attendance= | =Attendance= | ||
=Minutes= | =Minutes= | ||
− | * | + | * Neutron Flux in US Coils |
+ | ** US coil study: copper wrapped in G10 is the basic geometry | ||
+ | ** The neutron dose estimation obtained (see the summary table in the slides) | ||
+ | * Particle Flux on US Scanner Motors | ||
+ | ** Rate and energy deposit at the scanner motor areas | ||
+ | ** Before and after the lead brick shielding | ||
+ | ** Mark Pitt will calculate the upper limit for rate and flux of events reaching the main detector from the scanner motor | ||
+ | |||
=ZoomGov Meeting Information= | =ZoomGov Meeting Information= | ||
Latest revision as of 19:12, 5 June 2022
Back to Main Page >> Simulation Meetings
previous meeting << >> following meeting
Agenda
Attendance
Minutes
- Neutron Flux in US Coils
- US coil study: copper wrapped in G10 is the basic geometry
- The neutron dose estimation obtained (see the summary table in the slides)
- Particle Flux on US Scanner Motors
- Rate and energy deposit at the scanner motor areas
- Before and after the lead brick shielding
- Mark Pitt will calculate the upper limit for rate and flux of events reaching the main detector from the scanner motor
ZoomGov Meeting Information
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1613922154?pwd=QTFVUXpuNkVjQlZTa3pLMmhLNHRnUT09
Meeting ID: 161 392 2154
Passcode: 345237
One tap mobile +16692545252,,1613922154# US (San Jose) +16468287666,,1613922154# US (New York)
Dial by your location
+1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 551 285 1373 US +1 669 216 1590 US (San Jose) 833 568 8864 US Toll-free
Meeting ID: 161 392 2154 Find your local number: https://jlab-org.zoomgov.com/u/adCbXzUZgc
Join by SIP 1613922154@sip.zoomgov.com
Join by H.323 161.199.138.10 (US West) 161.199.136.10 (US East) Meeting ID: 161 392 2154 Passcode: 345237
Return to Simulation Meetings
Return to Simulations Main Page
Return to Main Page