Difference between revisions of "Simulation Meeting December 7 2021 11AM ET"

From Moller Wiki
Jump to: navigation, search
(Agenda)
 
(2 intermediate revisions by 2 users not shown)
Line 2: Line 2:
 
Back to [[Main_Page|Main Page]] >> [[Simulation_Meetings | Simulation Meetings]]
 
Back to [[Main_Page|Main Page]] >> [[Simulation_Meetings | Simulation Meetings]]
  
[[Simulation_Meeting_November_30_2021_11AM_ET | previous meeting]] <<  >> [[Simulation_Meeting_December_7_2021_11AM_ET | following meeting]]
+
[[Simulation_Meeting_November_30_2021_11AM_ET | previous meeting]] <<  >> [[Simulation_Meeting_December_21_2021_11AM_ET | following meeting]]
  
 
[[Simulations | Simulation page ]]
 
[[Simulations | Simulation page ]]
Line 11: Line 11:
 
# Target shielding update: Zuhal Demiroglu [https://moller.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=824 docDB824]
 
# Target shielding update: Zuhal Demiroglu [https://moller.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=824 docDB824]
 
# Update of develop: Ciprian Gal [https://moller.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=823 docDB823]
 
# Update of develop: Ciprian Gal [https://moller.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=823 docDB823]
 +
# Updated Collimator 1: Chandan Ghosh [https://moller.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=819 docDB819]
  
 
=Attendance=
 
=Attendance=
Line 16: Line 17:
  
 
=Minutes=
 
=Minutes=
#
+
#Shielding around the Power Supply Bunker region - Vassu Doomra
 +
## showed the PID energy spectra on this region
 +
## There is reconfiguration still ongoing by jlab engineering group.
 +
# Target shielding update: Zuhal Demiroglu
 +
## Now in configuration 20: roof of target and upstream torus is changed to barite and no bottom concrete in the DS of the target bunker
 +
## see a reduction in PID except EM bkg goes up by 4% (small) going into the Config 19 to config 20
 +
## removing the bottom concrete does not seem to affect the particle going to DS region
 +
## will move forward with this config 20 design
 +
## Showed the CAD diagram to confirm the config 20 changes proposed
 +
# Update of develop: Ciprian Gal
 +
## changes proposing for the develop from shielding sides
 +
## add Chandan's collimator changes and remove unwanted geometries
 +
## will arrange a meeting this week to finalize this
 +
# Updated Collimator 1: Chandan Ghosh
 +
## tweaks to water channel for cooling then could potential increase bkg due to the line of sight of col-1 US edge, therefore, shortened the col-1 length
 +
## this removed the line of sight issue (no one bounce photon tracks)
 +
## there is an increase of bkg coming thru the bore of the col-1 with new design that may need to tweak col-5 and 6 to block these background
 +
## where do we keep the sieve Chandan will follow up with JLab engineers
 +
 
 +
 +
 +
  
  

Latest revision as of 16:42, 20 December 2021

Back to Main Page >> Simulation Meetings

previous meeting << >> following meeting

Simulation page


Agenda

  1. Shielding around the PSBunker region - Vassu Doomra
  2. Target shielding update: Zuhal Demiroglu docDB824
  3. Update of develop: Ciprian Gal docDB823
  4. Updated Collimator 1: Chandan Ghosh docDB819

Attendance

Minutes

  1. Shielding around the Power Supply Bunker region - Vassu Doomra
    1. showed the PID energy spectra on this region
    2. There is reconfiguration still ongoing by jlab engineering group.
  2. Target shielding update: Zuhal Demiroglu
    1. Now in configuration 20: roof of target and upstream torus is changed to barite and no bottom concrete in the DS of the target bunker
    2. see a reduction in PID except EM bkg goes up by 4% (small) going into the Config 19 to config 20
    3. removing the bottom concrete does not seem to affect the particle going to DS region
    4. will move forward with this config 20 design
    5. Showed the CAD diagram to confirm the config 20 changes proposed
  3. Update of develop: Ciprian Gal
    1. changes proposing for the develop from shielding sides
    2. add Chandan's collimator changes and remove unwanted geometries
    3. will arrange a meeting this week to finalize this
  4. Updated Collimator 1: Chandan Ghosh
    1. tweaks to water channel for cooling then could potential increase bkg due to the line of sight of col-1 US edge, therefore, shortened the col-1 length
    2. this removed the line of sight issue (no one bounce photon tracks)
    3. there is an increase of bkg coming thru the bore of the col-1 with new design that may need to tweak col-5 and 6 to block these background
    4. where do we keep the sieve Chandan will follow up with JLab engineers




bluejeans information

Meeting ID 635010453


Meeting URL https://bluejeans.com/635010453


Here are more details about the meeting connection:


Connecting directly from a room system? 1) Dial: 199.48.152.152 or bjn.vc 2) Enter Meeting ID: 635 010 453

Just want to dial in on your phone? 1) +1.408.740.7256 (US)

   +1.888.240.2560 (US Toll Free)
   +1.408.317.9253 (Alternate number)

2) Enter Meeting ID: 635 010 453 3) Press #




Return to Simulation Meetings
Return to Simulations Main Page
Return to Main Page