Difference between revisions of "Simulation Meeting July 15 2021 2PM ET"

From Moller Wiki
Jump to: navigation, search
(Agenda)
(Attendance)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
Back to [[Main_Page|Main Page]] >> [[Simulation_Meetings | Simulation Meetings]]
 
Back to [[Main_Page|Main Page]] >> [[Simulation_Meetings | Simulation Meetings]]
  
[[Simulation_Meeting_July_8_2021_2PM_ET | previous meeting]] <<  >> [[Simulation_Meeting_July_15_2021_2PM_ET | following meeting]]
+
[[Simulation_Meeting_July_8_2021_2PM_ET | previous meeting]] <<  >> [[Simulation_Meeting_July_22_2021_2PM_ET | following meeting]]
  
 
[[Simulations | Simulation page ]]
 
[[Simulations | Simulation page ]]
Line 11: Line 11:
  
 
=Attendance=
 
=Attendance=
 +
Dave, Michael Gericke, Aditya, Zuhal Seyma Demiroglu, andrew, Sakib, Eric Sun, Ciprian Gal, Jon Mott, Cameron Clarke, David Flay, Chandan Ghosh, Devi Adhikari, Elham Gorgannejad, Sudip Bhattarai, Rakitha Beminiwattha, Nafis Rafat, Mark L. Pitt, Sandesh Gopinath, Paul King, Krishna Kumar, Probir Ghoshal, Caryn P, Jim Fast, David Kashy, wdconinc, Naz
  
 
=Minutes=
 
=Minutes=
#  
+
# Collar2 Region Shielding Update by Zuhal
 +
## Shielding configuration comparison for DS coil area with barrite wall or concrete wall before the DS collar area
 +
# Col-5 studies paused for now and Chandan will produce envelopes all the way to the end of the hall. Chandan will have results by end of this month.
 +
# We need to do a generator cross-check for ep and Moller with beam generator for very forward (below detector radius) and very large angles (above the ring radii)
  
 
=bluejeans information=
 
=bluejeans information=

Latest revision as of 18:18, 22 July 2021

Back to Main Page >> Simulation Meetings

previous meeting << >> following meeting

Simulation page


Agenda

  1. Collar2 Region Shielding Update: [1]

Attendance

Dave, Michael Gericke, Aditya, Zuhal Seyma Demiroglu, andrew, Sakib, Eric Sun, Ciprian Gal, Jon Mott, Cameron Clarke, David Flay, Chandan Ghosh, Devi Adhikari, Elham Gorgannejad, Sudip Bhattarai, Rakitha Beminiwattha, Nafis Rafat, Mark L. Pitt, Sandesh Gopinath, Paul King, Krishna Kumar, Probir Ghoshal, Caryn P, Jim Fast, David Kashy, wdconinc, Naz

Minutes

  1. Collar2 Region Shielding Update by Zuhal
    1. Shielding configuration comparison for DS coil area with barrite wall or concrete wall before the DS collar area
  2. Col-5 studies paused for now and Chandan will produce envelopes all the way to the end of the hall. Chandan will have results by end of this month.
  3. We need to do a generator cross-check for ep and Moller with beam generator for very forward (below detector radius) and very large angles (above the ring radii)

bluejeans information

Meeting ID 635010453


Meeting URL https://bluejeans.com/635010453


Here are more details about the meeting connection:


Connecting directly from a room system? 1) Dial: 199.48.152.152 or bjn.vc 2) Enter Meeting ID: 635 010 453

Just want to dial in on your phone? 1) +1.408.740.7256 (US)

   +1.888.240.2560 (US Toll Free)
   +1.408.317.9253 (Alternate number)

2) Enter Meeting ID: 635 010 453 3) Press #




Return to Simulation Meetings
Return to Simulations Main Page
Return to Main Page