Difference between revisions of "Simulation Meeting July 15 2021 2PM ET"
(→Agenda) |
(→Attendance) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
Back to [[Main_Page|Main Page]] >> [[Simulation_Meetings | Simulation Meetings]] | Back to [[Main_Page|Main Page]] >> [[Simulation_Meetings | Simulation Meetings]] | ||
− | [[Simulation_Meeting_July_8_2021_2PM_ET | previous meeting]] << >> [[ | + | [[Simulation_Meeting_July_8_2021_2PM_ET | previous meeting]] << >> [[Simulation_Meeting_July_22_2021_2PM_ET | following meeting]] |
[[Simulations | Simulation page ]] | [[Simulations | Simulation page ]] | ||
Line 11: | Line 11: | ||
=Attendance= | =Attendance= | ||
+ | Dave, Michael Gericke, Aditya, Zuhal Seyma Demiroglu, andrew, Sakib, Eric Sun, Ciprian Gal, Jon Mott, Cameron Clarke, David Flay, Chandan Ghosh, Devi Adhikari, Elham Gorgannejad, Sudip Bhattarai, Rakitha Beminiwattha, Nafis Rafat, Mark L. Pitt, Sandesh Gopinath, Paul King, Krishna Kumar, Probir Ghoshal, Caryn P, Jim Fast, David Kashy, wdconinc, Naz | ||
=Minutes= | =Minutes= | ||
− | # | + | # Collar2 Region Shielding Update by Zuhal |
+ | ## Shielding configuration comparison for DS coil area with barrite wall or concrete wall before the DS collar area | ||
+ | # Col-5 studies paused for now and Chandan will produce envelopes all the way to the end of the hall. Chandan will have results by end of this month. | ||
+ | # We need to do a generator cross-check for ep and Moller with beam generator for very forward (below detector radius) and very large angles (above the ring radii) | ||
=bluejeans information= | =bluejeans information= |
Latest revision as of 18:18, 22 July 2021
Back to Main Page >> Simulation Meetings
previous meeting << >> following meeting
Contents
[hide]Agenda
- Collar2 Region Shielding Update: [1]
Attendance
Dave, Michael Gericke, Aditya, Zuhal Seyma Demiroglu, andrew, Sakib, Eric Sun, Ciprian Gal, Jon Mott, Cameron Clarke, David Flay, Chandan Ghosh, Devi Adhikari, Elham Gorgannejad, Sudip Bhattarai, Rakitha Beminiwattha, Nafis Rafat, Mark L. Pitt, Sandesh Gopinath, Paul King, Krishna Kumar, Probir Ghoshal, Caryn P, Jim Fast, David Kashy, wdconinc, Naz
Minutes
- Collar2 Region Shielding Update by Zuhal
- Shielding configuration comparison for DS coil area with barrite wall or concrete wall before the DS collar area
- Col-5 studies paused for now and Chandan will produce envelopes all the way to the end of the hall. Chandan will have results by end of this month.
- We need to do a generator cross-check for ep and Moller with beam generator for very forward (below detector radius) and very large angles (above the ring radii)
bluejeans information
Meeting ID 635010453
Meeting URL
https://bluejeans.com/635010453
Here are more details about the meeting connection:
Connecting directly from a room system? 1) Dial: 199.48.152.152 or bjn.vc 2) Enter Meeting ID: 635 010 453
Just want to dial in on your phone? 1) +1.408.740.7256 (US)
+1.888.240.2560 (US Toll Free) +1.408.317.9253 (Alternate number)
2) Enter Meeting ID: 635 010 453 3) Press #
Return to Simulation Meetings
Return to Simulations Main Page
Return to Main Page