Difference between revisions of "Simulation Meeting March 18 2021 2PM ET"

From Moller Wiki
Jump to: navigation, search
(Attendance)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
Back to [[Main_Page|Main Page]] >> [[Simulation_Meetings | Simulation Meetings]]
 
Back to [[Main_Page|Main Page]] >> [[Simulation_Meetings | Simulation Meetings]]
  
[[Simulation_Meeting_March_11_2021_2PM_ET | previous meeting]] <<  >> [[Simulation_Meeting_March_18_2021_2PM_ET | following meeting]]
+
[[Simulation_Meeting_March_11_2021_2PM_ET | previous meeting]] <<  >> [[Simulation_Meeting_March_25_2021_2PM_ET | following meeting]]
  
 
[[Simulations | Simulation page ]]
 
[[Simulations | Simulation page ]]
Line 11: Line 11:
 
# Field Map update: Sakib [https://moller.jlab.org/wiki/index.php/File:FieldMapUpdates.pdf]
 
# Field Map update: Sakib [https://moller.jlab.org/wiki/index.php/File:FieldMapUpdates.pdf]
 
=Attendance=
 
=Attendance=
 
+
Wouter, ROBIN WINES, Ruben, sakib, sudip, Ciprian Gal, Devi Adhikari, Elham Gorgannejad, Rakitha Beminiwattha, David Kashy, Caryn, Nafis Rafat, Zhongling Ji, Dave, Dustin
  
 
=Minutes=
 
=Minutes=
#  
+
#Pion Detector
 
+
## Pi/e ratio of rates and light-weighted rates compared for different pi donut geometry
 +
## It seems like we may need a bigger donut and once we have a design we will check the main detector rates and PMT region (ring 7)
 +
# Field Map Update
 +
# Radial limit of 40 cm is too small for the downstream magnet. Increased to 50 cm
 +
# It seems to affect the ep peak and other outer radius signals at the detector plane
  
 
=bluejeans information=
 
=bluejeans information=

Latest revision as of 17:51, 25 March 2021

Back to Main Page >> Simulation Meetings

previous meeting << >> following meeting

Simulation page


Agenda

  1. Pion Detector update: Elham [1]
  2. Field Map update: Sakib [2]

Attendance

Wouter, ROBIN WINES, Ruben, sakib, sudip, Ciprian Gal, Devi Adhikari, Elham Gorgannejad, Rakitha Beminiwattha, David Kashy, Caryn, Nafis Rafat, Zhongling Ji, Dave, Dustin

Minutes

  1. Pion Detector
    1. Pi/e ratio of rates and light-weighted rates compared for different pi donut geometry
    2. It seems like we may need a bigger donut and once we have a design we will check the main detector rates and PMT region (ring 7)
  2. Field Map Update
  3. Radial limit of 40 cm is too small for the downstream magnet. Increased to 50 cm
  4. It seems to affect the ep peak and other outer radius signals at the detector plane

bluejeans information

Meeting ID 635010453


Meeting URL https://bluejeans.com/635010453


Here are more details about the meeting connection:


Connecting directly from a room system? 1) Dial: 199.48.152.152 or bjn.vc 2) Enter Meeting ID: 635 010 453

Just want to dial in on your phone? 1) +1.408.740.7256 (US)

   +1.888.240.2560 (US Toll Free)
   +1.408.317.9253 (Alternate number)

2) Enter Meeting ID: 635 010 453 3) Press #




Return to Simulation Meetings
Return to Simulations Main Page
Return to Main Page