Difference between revisions of "Simulation Meeting August 17 2023 230PM ET"

From Moller Wiki
Jump to: navigation, search
(Minutes)
 
Line 2: Line 2:
 
Back to [[Main_Page|Main Page]] >> [[Simulation_Meetings | Simulation Meetings]]  
 
Back to [[Main_Page|Main Page]] >> [[Simulation_Meetings | Simulation Meetings]]  
  
[[Simulation_Meeting_August_10_2023_230PM_ET | previous meeting]] <<  >> [[Simulation_Meeting_August_24_2023_230PM_ET | following meeting]]
+
[[Simulation_Meeting_August_10_2023_230PM_ET | previous meeting]] <<  >> [[Simulation_Meeting_August_24_2023_11AM_ET | following meeting]]
  
 
[[Simulations | Simulation page ]]
 
[[Simulations | Simulation page ]]

Latest revision as of 22:47, 23 August 2023

Back to Main Page >> Simulation Meetings

previous meeting << >> following meeting

Simulation page


Agenda

  1. Dump O-Ring Study Ryan docDB 1160

Attendance

Minutes

  • Dump O-Ring Study
    • O-ring EPDM or Viton as a material study was done using asymmetric field maps







Return to Simulation Meetings
Return to Simulations Main Page
Return to Main Page