Difference between revisions of "Simulation Meeting January 24 2022 10AM ET"
From Moller Wiki
(→ZoomGov Meeting Information) |
|||
(2 intermediate revisions by 2 users not shown) | |||
Line 2: | Line 2: | ||
Back to [[Main_Page|Main Page]] >> [[Simulation_Meetings | Simulation Meetings]] | Back to [[Main_Page|Main Page]] >> [[Simulation_Meetings | Simulation Meetings]] | ||
− | [[Simulation_Meeting_January_4_2022_11AM_ET | previous meeting]] << >> [[ | + | [[Simulation_Meeting_January_4_2022_11AM_ET | previous meeting]] << >> [[Simulation_Meeting_January_31_2022_10AM_ET | following meeting]] |
[[Simulations | Simulation page ]] | [[Simulations | Simulation page ]] | ||
Line 8: | Line 8: | ||
=Agenda= | =Agenda= | ||
− | # | + | # Updated shielding design [https://moller.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=857 docDB857] |
+ | # Comparison of the particle rate distributions between the shielding configuration20 and develop-branch [https://moller.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=858 docDB858] | ||
=Attendance= | =Attendance= | ||
Line 14: | Line 15: | ||
=Minutes= | =Minutes= | ||
− | # | + | # Updated shielding design by Zuhal: |
+ | ## Removed underneath of the beam-right target bunker increases the background in the new configuration | ||
+ | ## Increased overlap between the inner and outer ring of collar 2 | ||
+ | ## Moving forward re-design the PS bunker and revert to the previous design for the target bunker | ||
+ | ## With keeping the underneath of the target bunker | ||
+ | ## Update MIT engineers on what US area simulation group changing: KK, Ciprian, and Zuhal will update the MIT group | ||
+ | # Comparison of the particle rate distributions between the shielding configuration20 and develop-branch: Zuhal | ||
+ | ## Compared latest config-20 , Chandan's latest branch and develop for changes in the geometry | ||
+ | ## Official name, with official z location for all the shielding elements going forward | ||
=ZoomGov Meeting Information= | =ZoomGov Meeting Information= |
Latest revision as of 01:39, 31 January 2022
Back to Main Page >> Simulation Meetings
previous meeting << >> following meeting
Agenda
- Updated shielding design docDB857
- Comparison of the particle rate distributions between the shielding configuration20 and develop-branch docDB858
Attendance
Minutes
- Updated shielding design by Zuhal:
- Removed underneath of the beam-right target bunker increases the background in the new configuration
- Increased overlap between the inner and outer ring of collar 2
- Moving forward re-design the PS bunker and revert to the previous design for the target bunker
- With keeping the underneath of the target bunker
- Update MIT engineers on what US area simulation group changing: KK, Ciprian, and Zuhal will update the MIT group
- Comparison of the particle rate distributions between the shielding configuration20 and develop-branch: Zuhal
- Compared latest config-20 , Chandan's latest branch and develop for changes in the geometry
- Official name, with official z location for all the shielding elements going forward
ZoomGov Meeting Information
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1613922154?pwd=QTFVUXpuNkVjQlZTa3pLMmhLNHRnUT09
Meeting ID: 161 392 2154
Passcode: 345237
One tap mobile +16692545252,,1613922154# US (San Jose) +16468287666,,1613922154# US (New York)
Dial by your location
+1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 551 285 1373 US +1 669 216 1590 US (San Jose) 833 568 8864 US Toll-free
Meeting ID: 161 392 2154 Find your local number: https://jlab-org.zoomgov.com/u/adCbXzUZgc
Join by SIP 1613922154@sip.zoomgov.com
Join by H.323 161.199.138.10 (US West) 161.199.136.10 (US East) Meeting ID: 161 392 2154 Passcode: 345237
Return to Simulation Meetings
Return to Simulations Main Page
Return to Main Page