(Created page with "[https://moller.jlab.org/wiki/index.php/Gem_Detector_System Back to GEM @ Stonybrook page] == Meeting Information == GEM @ Stonybrook Meeting<br> Wednesday January 12, 2022<...")
 
(Agenda)
Line 14: Line 14:
  
 
== Agenda ==
 
== Agenda ==
 +
# Introduction to Moller physics (Vassu)
 +
# Introduction on Moller Simulation (Vassu)
 
# Cleaning progress on the cleaning room
 
# Cleaning progress on the cleaning room
 
# Clean room delivery and setup
 
# Clean room delivery and setup
Line 19: Line 21:
 
## Stand-alone simulation. (Contacted Ciprian)
 
## Stand-alone simulation. (Contacted Ciprian)
 
## Parsing the GMn Gem data. (Contacted GMn)
 
## Parsing the GMn Gem data. (Contacted GMn)
## QCD Server @ SBU updates.  
+
## QCD Server @ SBU updates.
## Vassu will give a short introduction to Moller physics during the next meeting
+
  
 
== Summary and Next Step ==
 
== Summary and Next Step ==

Revision as of 15:11, 10 January 2022

Back to GEM @ Stonybrook page


Meeting Information

GEM @ Stonybrook Meeting
Wednesday January 12, 2022
3:30 pm, ET
Meeting Zoom link: https://stonybrook.zoom.us/j/96999714444?pwd=NGhNNXFQQzFlRWxGRnh5VHM1YnN0dz09

Project background

  1. Klaus' slides on the Moller GEM is to be added here for reference.
  2. Stonybrook is assigned to construct 12 out of the 28 layers of GEM trackers for the Moller experiment
  3. Two prototype trackers to be constructed by late 2022. GEM material (three rectangular sheets) will arrive SBU in early March; frames will arrive later

Agenda

  1. Introduction to Moller physics (Vassu)
  2. Introduction on Moller Simulation (Vassu)
  3. Cleaning progress on the cleaning room
  4. Clean room delivery and setup
  5. Other next step items
    1. Stand-alone simulation. (Contacted Ciprian)
    2. Parsing the GMn Gem data. (Contacted GMn)
    3. QCD Server @ SBU updates.

Summary and Next Step

  1. Clean oom delivery and setup
    • Cleanroom delivered, floor cleaning, awaiting outer tent to be set up
    1. Full Moller simulation: meeting Ciprian at Friday 2pm
    2. Parsing the GMn Gem data: waiting on Andrew's further communication.
    3. QCD Server @ SBU updates: computer model + UP + backup storage were selected, awaiting final approval
  2. During next meeting
    • Vassu will give a short introduction to Moller physics .
    • Vassu will give a short introduction on Moller Simulation.
  3. Obtaining JLab account for Klaus and Prakhar

Task list

  1. Sub-tasks (required volunteers, or will be assigned):
    • Preparation stage:
    1. Clearing out a perimeter in the basement lab (Bill, Vassu, Weibing).
    2. setting up the cleanroom. (Klaus, Bill and others)
    3. Setting up the latest JLAb DAQ system: CODA, and configure it to be used for calibrating the prototype GEM trackers (Bill)
    4. Looking at parsing BigBite data to understand the expected performance.
    5. Simulation to get expected GEM response? (Not a priority right now)
    6. Communicate with machine shop to make a stand for hosting the manufactured prototype based on the CAD drawing (Bill)
    • Manufacturing stage:
    1. Manufacturing/stretching GEM sheet and mount to bracket (with glue) inside the cleanroom (Klaus and Prakhar)
    • Calibration stage:
    1. Operating X-ray gun in in grid and mapping out the efficiency and gain in each sector of the GEM response: efficiency, uniformity, gain, etc (Bill & others)