Difference between revisions of "December 09, 2021"
From Moller Wiki
(→Meeting Disgust) |
(→Meeting Disgust) |
||
Line 12: | Line 12: | ||
#* Stonybrook is assigned to construct 12 out of the 28 layers of GEM trackers for the Moller experiment | #* Stonybrook is assigned to construct 12 out of the 28 layers of GEM trackers for the Moller experiment | ||
#* Two prototype trackers to be constructed by late 2022. GEM material (three rectangular sheets) will arrive SBU in early March; frames will arrive later | #* Two prototype trackers to be constructed by late 2022. GEM material (three rectangular sheets) will arrive SBU in early March; frames will arrive later | ||
− | |||
− | |||
# Sub-tasks (required volunteers, or will be assigned): | # Sub-tasks (required volunteers, or will be assigned): | ||
− | #* Clearing out a perimeter in the basement lab, | + | |
− | #* Setting latest JLAb DAQ system: CODA, and configure it to be used for calibrating the prototype GEM trackers | + | #* Preparation stage: |
− | #* | + | #* Clearing out a perimeter in the basement lab (Bill, Vassu, Weibing). |
− | #* | + | #* setting up the cleanroom. |
− | + | #* Setting latest JLAb DAQ system: CODA, and configure it to be used for calibrating the prototype GEM trackers (Bill) | |
+ | #* Looking at parsing BigBite date to understand the expected performance. | ||
+ | #* Simulation to get expected GEM response? (Not a priority right now) | ||
+ | |||
#* Manufacturing stage: | #* Manufacturing stage: | ||
− | #** Manufacturing/stretching GEM sheet and mount to bracket (with glue) inside the | + | #** Manufacturing/stretching GEM sheet and mount to bracket (with glue) inside the cleanroom (Klaus and Prakhar) |
#* Calibration stage: | #* Calibration stage: | ||
− | #** | + | #** Operating X-ray gun in in grid and mapping out the efficiency and gain in each sector of the GEM response: efficiency, uniformity, gain, etc (Bill & others) |
# | # | ||
# Additional equipment needed: | # Additional equipment needed: | ||
#* Cleanroom | #* Cleanroom | ||
− | #* Gas system? CO2 and Helium mixture | + | #* Gas system? CO2 and Helium mixture. |
+ | #** How good does the mixture have to be? Does the mixture ratio matter? | ||
#* X-Ray gun mounted on arms that move in small stepped | #* X-Ray gun mounted on arms that move in small stepped |
Revision as of 19:41, 9 December 2021
Meeting Information
GEM @ Stonybrook Meeting
Wednesday December 08, 2021
3:30 pm, ET
Agenda
- Kicking off the Gem work planning at Stonybrook.
Meeting Disgust
- Project background
- Stonybrook is assigned to construct 12 out of the 28 layers of GEM trackers for the Moller experiment
- Two prototype trackers to be constructed by late 2022. GEM material (three rectangular sheets) will arrive SBU in early March; frames will arrive later
- Sub-tasks (required volunteers, or will be assigned):
- Preparation stage:
- Clearing out a perimeter in the basement lab (Bill, Vassu, Weibing).
- setting up the cleanroom.
- Setting latest JLAb DAQ system: CODA, and configure it to be used for calibrating the prototype GEM trackers (Bill)
- Looking at parsing BigBite date to understand the expected performance.
- Simulation to get expected GEM response? (Not a priority right now)
- Manufacturing stage:
- Manufacturing/stretching GEM sheet and mount to bracket (with glue) inside the cleanroom (Klaus and Prakhar)
- Calibration stage:
- Operating X-ray gun in in grid and mapping out the efficiency and gain in each sector of the GEM response: efficiency, uniformity, gain, etc (Bill & others)
- Manufacturing stage:
- Additional equipment needed:
- Cleanroom
- Gas system? CO2 and Helium mixture.
- How good does the mixture have to be? Does the mixture ratio matter?
- X-Ray gun mounted on arms that move in small stepped