Difference between revisions of "December 09, 2021"

From Moller Wiki
Jump to: navigation, search
(Meeting Disgust)
(Meeting Disgust)
Line 10: Line 10:
 
== Meeting Disgust ==
 
== Meeting Disgust ==
 
# Project background  
 
# Project background  
#*
+
#* Stonybrook is assigned to construct 12 out of the 28 layers of GEM trackers for the Moller experiment
#
+
#* Two prototype trackers to be constructed by late 2022. GEM material (three rectangular sheets) will arrive SBU in early March; frames will arrive later
 
#
 
#
 +
#
 +
# Sub-tasks (required volunteers, or will be assigned):
 +
#* Clearing out a perimeter in the basement lab, and setting up the cleanroom.
 +
#* Setting latest JLAb DAQ system: CODA, and configure it to be used for calibrating the prototype GEM trackers
 +
#*
 +
#* Setting
 +
#*
 +
#* Manufacturing stage:
 +
#** Manufacturing/stretching GEM sheet and mount to bracket (with glue) inside the clean room (Klaus and Prakhar) 
 +
#* Calibration stage:
 +
#** Manufacturing/stretching GEM sheet and mount to bracket (with glue) inside the clean room (Klaus and Prakhar) 
 
#
 
#
 +
# Additional equipment needed:
 +
#* Cleanroom
 +
#* Gas system? CO2 and Helium mixture
 +
#* X-Ray gun mounted on arms that move in small stepped

Revision as of 19:35, 9 December 2021

Meeting Information

GEM @ Stonybrook Meeting
Wednesday December 08, 2021
3:30 pm, ET

Agenda

  1. Kicking off the Gem work planning at Stonybrook.

Meeting Disgust

  1. Project background
    • Stonybrook is assigned to construct 12 out of the 28 layers of GEM trackers for the Moller experiment
    • Two prototype trackers to be constructed by late 2022. GEM material (three rectangular sheets) will arrive SBU in early March; frames will arrive later
  2. Sub-tasks (required volunteers, or will be assigned):
    • Clearing out a perimeter in the basement lab, and setting up the cleanroom.
    • Setting latest JLAb DAQ system: CODA, and configure it to be used for calibrating the prototype GEM trackers
    • Setting
    • Manufacturing stage:
      • Manufacturing/stretching GEM sheet and mount to bracket (with glue) inside the clean room (Klaus and Prakhar)
    • Calibration stage:
      • Manufacturing/stretching GEM sheet and mount to bracket (with glue) inside the clean room (Klaus and Prakhar)
  3. Additional equipment needed:
    • Cleanroom
    • Gas system? CO2 and Helium mixture
    • X-Ray gun mounted on arms that move in small stepped