Difference between revisions of "December 09, 2021"

From Moller Wiki
Jump to: navigation, search
(Meeting Information)
(Replaced content with "== Meeting Information == GEM @ Stonybrook Meeting<br> Wednesday December 08, 2021<br> 3:30 pm, ET<br> == Agenda == # Kicking off the Gem work planning at Stonybrook....")
Line 3: Line 3:
 
Wednesday December 08, 2021<br>
 
Wednesday December 08, 2021<br>
 
3:30 pm, ET<br>
 
3:30 pm, ET<br>
 
== Connection Using Bluejeans ==
 
<!--
 
# To join via Polycom room system go to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 846453895.
 
# To join via a Web Browser, go to the page [https://bluejeans.com/846453895] https://bluejeans.com/846453895 .
 
# To join via phone, use one of the following numbers and the Conference ID: 846453895
 
#* US or Canada: +1 408 740 7256 or
 
#* US or Canada: +1 888 240 2560
 
# More information on connecting to [[Connect to the Data Challenge Meetings|bluejeans]] is available.
 
--!>
 
  
 
== Agenda ==
 
== Agenda ==
  
# Announcements
+
# Kicking off the Gem work planning at Stonybrook.  
# Hardware work (All)
+
 
#* Latest inspections of mirror prototypes (Bill)
+
== Meeting Disgust ==
#** [https://logbooks.jlab.org/entry/3934273 October 26th inspection and water changeout]
+
# Review of 2020 studies (All)
+
#* [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary#Full_REST_Production Spring and Summer 2020 data production status] all complete but ongoing issues with tape and [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Analysis_Launch Analysis launches]
+
#* Geometric reconstruction update (Roman)
+
#* Simulation needs:
+
#** Ad-hoc reduction in photon yields (in mcsmear) to match data: until mirror reflectivity dependence on incident angle is implemented
+
#** Tagged version of halld_sim with any updates (version set compiled against [https://github.com/JeffersonLab/halld_recon/releases/tag/4.16.2 halld_recon 4.16.2] used in data production)
+
#** Others
+
#* Action items (from previous meetings)
+
#** [https://github.com/JeffersonLab/HDGeant4/issues/191 Add incident angle dependence to mirror reflectivity]
+
#** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=5286 Global alignment issues] see slide 15-18 of CM talk (All)
+
#*** Early studies of [https://halldweb.jlab.org/wiki/index.php/FDC_tilt/alignment_update FDC tilt]
+
#*** Possible rotation of magnetic field: impact on extrapolations to DIRC? 
+
#*** Generate MC with rotated field and reconstruct with nominal?
+
#** Reducing background contamination in pi/K samples: KinFit &Delta;&chi;<sup>2</sup> between 2pi and 2k reactions, robust sideband subtraction
+
#** [https://github.com/yunjie-yang/FastDIRC4GlueX FastDIRC documentation] (Yunjie)
+
  
# AOB
+
#

Revision as of 19:20, 9 December 2021

Meeting Information

GEM @ Stonybrook Meeting
Wednesday December 08, 2021
3:30 pm, ET

Agenda

  1. Kicking off the Gem work planning at Stonybrook.

Meeting Disgust