== Agenda == | == Agenda == | ||
* Progress on prototype | * Progress on prototype | ||
− | * Discussion on event timing | + | * Discussion on trigger/event timing |
− | ** We plan to run MOLLER with a 10us "spin flip" period. The beam travel time from injector to the hall is ~20us, so a new helicity integration window starts in the injector while the old integration window in the hall is finishing. How best to coordinate starting the integration and building events? Should INJ and hall readout be coupled or independent (baseline design concept has them coupled)? | + | ** We plan to run MOLLER with a 10us "spin flip" period. The beam travel time from injector to the hall is ~20us, so a new helicity integration window starts in the injector while the old integration window in the hall is finishing. |
+ | *** How best to coordinate starting the integration and building events? We had discussed having the time shift done in the TI connection. | ||
+ | *** Should INJ and hall readout be coupled or independent (baseline design concept has them coupled)? | ||
* Activity updates | * Activity updates | ||
* General discussion | * General discussion |
Revision as of 21:00, 15 July 2021
Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings
previous meeting << >> following meeting
Meeting information
Meeting time: 3:30pm Eastern BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 Other BlueJeans access phone numbers are listed at https://www.bluejeans.com/premium-numbers Bluejeans CODE: 641 252 323 Bluejeans link: https://bluejeans.com/641252323
Agenda
- Progress on prototype
- Discussion on trigger/event timing
- We plan to run MOLLER with a 10us "spin flip" period. The beam travel time from injector to the hall is ~20us, so a new helicity integration window starts in the injector while the old integration window in the hall is finishing.
- How best to coordinate starting the integration and building events? We had discussed having the time shift done in the TI connection.
- Should INJ and hall readout be coupled or independent (baseline design concept has them coupled)?
- We plan to run MOLLER with a 10us "spin flip" period. The beam travel time from injector to the hall is ~20us, so a new helicity integration window starts in the injector while the old integration window in the hall is finishing.
- Activity updates
- General discussion
Minutes
Recording on Bluejeans.com:
Participants: