Pion Meeting January 29 2021 11AM ET
From Moller Wiki
(Redirected from Pion Meeting January 28 2021 11AM ET)
Back to Main Page >> Pion Meetings
- Bluejeans link: 420 107 252
- Dial-in: 408-740-7256 (US), 888-240-2560 (US Toll Free), 408-317-9253 (Alternate number)
Agenda
- Lucite detector shielding from downstream and at inner radius (Elham) [1]
Attendance
Elham, Wouter, David, Jim
Minutes
- Lucite detector shielding from downstream and at inner radius
- 3 geometries: "original" with lucite far downstream of Pb donut, "new" with thinner/shorter lucite just downstream of Pb donut, "shielded new" with additional shielding
- "new" geometry avoids showermax secondaries into lucite in other sector
- However, still only 10% of light is from Moller electron generator, while there are still 100 times more pions
- Possible ideas are both low energy electrons and the optical geometry selecting for the backgrounds over forward going pions
- "shielded new" removes low energy particles that are hitting the lucite when moving backwards
- Q: What happens if we change the air to vacuum again? How much does scattering of air direct secondaries from the showermax back into the top of lucite detector?
- Q: How many primary electrons still reach the lucite? Is there punchthrough?
- Q: Can we replace the donut by a wall with a hole in simulation?
- Q: Canonical thickness of downstream inner radial lead shielding would be 4". Can this be increased?
- Q: Diffuse reflection on the lucite surfaces? Fermilab approach.